X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0295070405000

Well Details

Well ID: 0295070405000
Loading map...
Location: 00/05-04-029-07W5/0
Location Alias: 00/05-04-29-07 W5M
Location Alias 2: 00/05-04-029-07 W5/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 5
Range: 07
Section: 04
County/Municipality: Municipal District of Bighorn No. 8
Well Name: Canlin WCATH 5-4-29-7
Operator Name: Canlin Energy Corporation
License Number: 0144801
License Date: 1990-07-16
License Status: Amended
Spud Date: 1990-08-17
Final Drill Date: 1990-11-22
Well Total Depth: 3768.00 m
Surface Hole Latitude: 51.448308
Surface Hole Longitude: -114.938662

For data sources see[1][2]

Well History

Date Event
1990-07-16 Obtained License
1990-08-20 Surface Casing Operation Performed
1990-08-22 Well Log Performed
1990-08-23 Direction Drilling Operation Performed - Deviate
1990-11-22 Finished Drilling
1990-11-22 Well Mode changed to Drilled and Cased
1990-11-23 Well Log Performed
1990-11-24 Well Log Performed
1990-11-25 Well Log Performed
1990-11-29 Production Casing Operation Performed
1990-11-29 Rig Released
1991-01-14 Well Log Performed
1991-01-16 Well Log Performed
1991-01-17 Perforation Treatment Performed - Jet Perforation
1991-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-01-23 Well Log Performed
1991-01-24 Perforation Treatment Performed - Jet Perforation
1991-01-24 Well Log Performed
1991-01-27 Perforation Treatment Performed - Fractured
1991-02-21 Well Log Performed
1991-02-25 Perforation Treatment Performed - Jet Perforation
1991-02-25 Well Log Performed
1991-03-05 Well Log Performed
1991-03-10 Perforation Treatment Performed - Fractured
1991-11-11 Well Log Performed
1991-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-12-04 Well Began Production
1991-12-04 Well Fluid changed to Gas
1991-12-04 Well Mode changed to Flowing
2004-09-14 Well Log Performed
2007-06-10 Well Log Performed
2007-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-08-23 470.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-01-17 Perforation 3316.00 3326.00 16
2007-06-11 Packing Device Capped w/Cement 3254.60 3257.00 0
1991-01-20 Acid Treatment 3316.00 3326.00 0
1991-01-24 Perforation 3243.00 3253.00 16
1991-01-24 Perforation 3260.00 3298.00 16
1991-01-27 Fracture 3243.00 3298.00 0
1991-02-25 Perforation 3095.00 3136.00 16
1991-02-25 Perforation 3143.00 3159.00 16
1991-03-10 Fracture 3095.00 3159.00 0
1991-11-15 Acid Treatment 3095.00 3298.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 661 0.0 0.0 0.0
1992 8537 0.0 0.0 0.0
1993 8682 0.0 0.0 0.0
1994 8038 0.0 0.0 0.0
1995 8385 0.0 0.0 0.0
1996 8562 0.0 0.0 0.0
1997 8254 0.0 0.0 0.0
1998 7643 0.0 0.0 0.0
1999 7195 0.0 0.0 0.0
2000 8453 0.0 0.0 0.0
2001 7700 0.0 0.0 0.0
2002 8649 0.0 0.0 0.0
2003 7819 0.0 0.0 0.0
2004 7984 0.0 0.0 0.0
2005 8314 0.0 0.0 0.0
2006 8468 0.0 0.0 0.0
2007 8303 0.0 0.0 0.0
2008 7608 0.0 0.0 0.0
2009 8537 0.0 0.0 0.0
2010 7608 0.0 0.0 0.0
2011 8305 0.0 0.0 0.0
2012 7020 0.0 0.0 0.0
2013 8194 0.0 0.0 0.0
2014 8152 0.0 0.0 0.0
2015 7977 0.0 0.0 0.0
2016 8164 0.0 0.0 0.0
2017 8459 0.0 0.0 0.0
2018 7488 0.0 0.0 0.0
2019 5693 0.0 0.0 0.0
2020 1919 0.0 0.0 0.0

For data sources see[6]

References