X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0295070710000

Well Details

Well ID: 0295070710000
Loading map...
Location: 00/10-07-029-07W5/0
Location Alias: 00/10-07-29-07 W5M
Location Alias 2: 00/10-07-029-07 W5/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 5
Range: 07
Section: 07
County/Municipality: Municipal District of Bighorn No. 8
Well Name: Canlin WCATH 10-7-29-7
Operator Name: Canlin Energy Corporation
License Number: 0087634
License Date: 1980-12-12
License Status: Issued
Spud Date: 1981-01-17
Final Drill Date: 1981-05-18
Well Total Depth: 3689.00 m
Surface Hole Latitude: 51.469100
Surface Hole Longitude: -114.975599

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-12-12 Obtained License
1981-01-17 Direction Drilling Operation Performed - 98
1981-05-18 Finished Drilling
1981-05-24 Liner Casing Operation Performed
1981-05-26 Well Mode changed to Drilled and Cased
1981-11-05 Perforation Treatment Performed - Jet Perforation
1981-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-11-11 Perforation Treatment Performed - Jet Perforation
1981-11-12 Perforation Treatment Performed - Fractured
1981-12-01 Perforation Treatment Performed - Jet Perforation
1981-12-11 Perforation Treatment Performed - Jet Perforation
1988-10-01 Well Began Production
1988-10-01 Well Fluid changed to Gas
1988-10-01 Well Mode changed to Flowing
2009-05-01 Well Type changed to Observation
2011-02-01 Well Fluid changed to Gas
2011-02-01 Well Mode changed to Testing
2011-03-11 Well Fluid changed to Gas
2011-03-11 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1981-01-17 1446.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-11-05 Perforation 3626.00 3628.00 3
1981-12-01 Perforation 3492.00 3495.00 3
1981-12-01 Perforation 3500.00 3503.00 3
1981-12-01 Perforation 3505.00 3508.00 3
1981-12-01 Perforation 3512.00 3520.00 3
1981-12-01 Perforation 3523.00 3527.00 3
1981-12-11 Perforation 3492.00 3495.00 3
1981-12-11 Perforation 3500.00 3503.00 3
1981-12-11 Perforation 3505.00 3508.00 3
1981-12-11 Perforation 3512.00 3520.00 3
1981-12-11 Perforation 3523.00 3527.00 3
1981-11-05 Perforation 3648.00 3650.00 3
1981-11-05 Perforation 3656.00 3661.00 3
1981-11-05 Perforation 3669.00 3673.00 3
1981-11-08 Packing Device Capped w/Cement 3601.00 3609.00 0
1981-11-11 Perforation 3538.00 3539.00 12
1981-11-11 Perforation 3539.00 3546.00 3
1981-11-11 Perforation 3551.00 3555.00 3
1981-11-12 Fracture 3538.00 3555.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 1554 0.0 0.0 0.0
1989 6547 0.0 0.0 0.0
1990 7343 0.0 0.0 0.0
1991 7683 0.0 0.0 0.0
1992 7760 0.0 0.0 0.0
1993 8566 0.0 0.0 0.0
1994 8083 0.0 0.0 0.0
1995 8616 0.0 0.0 0.0
1996 8368 0.0 0.0 0.0
1997 7838 0.0 0.0 0.0
1998 8579 0.0 0.0 0.0
1999 8558 0.0 0.0 0.0
2000 8260 0.0 0.0 0.0
2001 8440 0.0 0.0 0.0
2002 8613 0.0 0.0 0.0
2003 7721 0.0 0.0 0.0
2004 7976 0.0 0.0 0.0
2005 8173 0.0 0.0 0.0
2006 7016 0.0 0.0 0.0
2011 6480 0.0 0.0 0.0
2012 7899 0.0 0.0 0.0
2013 7009 0.0 0.0 0.0
2014 7872 0.0 0.0 0.0
2015 7855 0.0 0.0 0.0
2016 8170 0.0 0.0 0.0
2017 8308 0.0 0.0 0.0
2018 7370 0.0 0.0 0.0
2019 4060 0.0 0.0 0.0
2020 2029 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-11-06 No Incident Encountered 0.00 0.00

For data sources see[7]

References