If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304013504003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.608192,"lon":-110.047076,"icon":""}]} |
Location: 00/04-35-030-01W4/3 | |
Location Alias: 00/04-35-30-01 W4M | |
Location Alias 2: 00/04-35-030-01 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 01 | |
Section: 35 | |
County/Municipality: Special Areas No. 3 | |
Well Name: KALLISTO ANTLOP 4-35-30-1 | |
Operator Name: Steelhead Petroleum Ltd. | |
License Number: 0258997 | |
License Date: 2001-08-28 | |
License Status: Suspension | |
Spud Date: 2001-09-07 | |
Final Drill Date: 2001-09-10 | |
Well Total Depth: 915.00 m | |
Surface Hole Latitude: 51.608192 | |
Surface Hole Longitude: -110.047076 |
Date | Event |
---|---|
2001-08-28 | Obtained License |
2001-09-08 | Surface Casing Operation Performed |
2001-09-10 | Finished Drilling |
2001-09-10 | Well Log Performed |
2001-09-10 | Well Mode changed to Drilled and Cased |
2001-09-11 | Production Casing Operation Performed |
2001-09-11 | Rig Released |
2001-09-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-09-23 | Perforation Treatment Performed - Jet Perforation |
2001-09-23 | Plug Back Performed |
2001-09-23 | Well Log Performed |
2001-09-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-09-24 | Perforation Treatment Performed - Jet Perforation |
2001-09-24 | Plug Back Performed |
2001-09-24 | Well Log Performed |
2001-11-17 | Well Began Production |
2001-11-17 | Well Fluid changed to Gas |
2001-11-17 | Well Mode changed to Flowing |
2003-02-01 | Well Fluid changed to Gas |
2003-02-01 | Well Mode changed to Suspended |
2006-01-09 | Well Fluid changed to Crude Oil |
2006-01-09 | Well Mode changed to Pumping |
2018-01-01 | Well Fluid changed to Crude Oil |
2018-01-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2001-09-23 | Perforation | 872.70 | 874.70 | 17 |
2001-09-23 | Packing Device Capped w/Cement | 862.00 | 870.00 | 0 |
2001-09-23 | Perforation | 834.50 | 837.50 | 17 |
2001-09-23 | Perforation | 840.70 | 843.00 | 17 |
2001-09-24 | Packing Device Capped w/Cement | 824.00 | 832.00 | 0 |
2001-09-24 | Perforation | 744.50 | 745.50 | 17 |
2001-09-24 | Perforation | 748.50 | 749.50 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 638 | 0.0 | 0.0 | 0.0 |
2002 | 14 | 0.0 | 0.0 | 0.0 |
2006 | 8156 | 0.0 | 0.0 | 0.0 |
2007 | 6484 | 0.0 | 0.0 | 0.0 |
2008 | 8098 | 0.0 | 0.0 | 0.0 |
2009 | 8483 | 0.0 | 0.0 | 0.0 |
2010 | 8711 | 0.0 | 0.0 | 0.0 |
2011 | 7396 | 0.0 | 0.0 | 0.0 |
2012 | 8571 | 0.0 | 0.0 | 0.0 |
2013 | 8043 | 0.0 | 0.0 | 0.0 |
2014 | 8671 | 0.0 | 0.0 | 0.0 |
2015 | 7444 | 0.0 | 0.0 | 0.0 |
2016 | 4546 | 0.0 | 0.0 | 0.0 |
2017 | 347 | 0.0 | 0.0 | 0.0 |
For data sources see[5]