If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304013511020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.61585,"lon":-110.040852,"icon":""}]} |
Location: 02/11-35-030-01W4/0 | |
Location Alias: 02/11-35-30-01 W4M | |
Location Alias 2: 02/11-35-030-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 01 | |
Section: 35 | |
County/Municipality: Special Areas No. 3 | |
Well Name: KALLISTO ANTLOP 11-35-30-1 | |
Operator Name: Steelhead Petroleum Ltd. | |
License Number: 0362541 | |
License Date: 2006-08-31 | |
License Status: Suspension | |
Spud Date: 2006-09-09 | |
Final Drill Date: 2006-09-12 | |
Well Total Depth: 922.00 m | |
Surface Hole Latitude: 51.615850 | |
Surface Hole Longitude: -110.040852 |
Date | Event |
---|---|
2006-08-31 | Obtained License |
2006-09-10 | Surface Casing Operation Performed |
2006-09-12 | Finished Drilling |
2006-09-12 | Production Casing Operation Performed |
2006-09-12 | Well Log Performed |
2006-09-12 | Well Mode changed to Drilled and Cased |
2006-09-13 | Rig Released |
2006-10-02 | Perforation Treatment Performed - Jet Perforation |
2006-10-02 | Well Log Performed |
2006-12-08 | Well Began Production |
2006-12-08 | Well Fluid changed to Gas |
2006-12-08 | Well Mode changed to Flowing |
2007-07-06 | Well Fluid changed to Gas |
2007-07-06 | Well Mode changed to Suspended |
2007-07-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-07-23 | Perforation Treatment Performed - Jet Perforation |
2010-06-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-06-23 | Perforation Treatment Performed - Jet Perforation |
2010-06-23 | Plug Back Performed |
2011-10-07 | Perforation Treatment Performed - Jet Perforation |
2011-10-13 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-10-02 | Perforation | 879.00 | 885.00 | 20 |
2007-07-22 | Packing Device Capped w/Cement | 864.00 | 872.00 | 0 |
2007-07-23 | Perforation | 840.50 | 842.50 | 17 |
2010-06-23 | Packing Device Capped w/Cement | 827.00 | 835.00 | 0 |
2010-06-23 | Perforation | 802.50 | 803.50 | 14 |
2011-10-07 | Perforation | 757.00 | 760.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 336 | 0.0 | 0.0 | 0.0 |
2007 | 2934 | 0.0 | 0.0 | 0.0 |
For data sources see[5]