If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304042606023 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.596593,"lon":-110.46691,"icon":""}]} |
Location: 02/06-26-030-04W4/3 | |
Location Alias: 02/06-26-30-04 W4M | |
Location Alias 2: 02/06-26-030-04 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 04 | |
Section: 26 | |
County/Municipality: Special Areas No. 3 | |
Well Name: Canlin SEDALIA 6-26-30-4 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0335570 | |
License Date: 2005-07-28 | |
License Status: Issued | |
Spud Date: 2005-08-15 | |
Final Drill Date: 2005-10-06 | |
Well Total Depth: 861.00 m | |
Surface Hole Latitude: 51.596593 | |
Surface Hole Longitude: -110.466910 |
Date | Event |
---|---|
2005-07-28 | Obtained License |
2005-08-21 | Surface Casing Operation Performed |
2005-10-06 | Finished Drilling |
2005-10-06 | Well Mode changed to Drilled and Cased |
2005-10-07 | Production Casing Operation Performed |
2005-10-07 | Rig Released |
2005-10-07 | Well Log Performed |
2005-10-13 | Perforation Treatment Performed - Jet Perforation |
2005-10-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-10-14 | Perforation Treatment Performed - Jet Perforation |
2005-10-14 | Plug Back Performed |
2005-12-07 | Perforation Treatment Performed - Fractured |
2009-02-10 | Perforation Treatment Performed - Jet Perforation |
2009-02-24 | Well Began Production |
2009-02-24 | Well Fluid changed to Gas |
2009-02-24 | Well Mode changed to Flowing |
2009-03-01 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-10-13 | Perforation | 828.00 | 829.00 | 17 |
2005-10-14 | Packing Device Capped w/Cement | 815.00 | 823.00 | 0 |
2005-10-14 | Perforation | 779.50 | 783.00 | 17 |
2005-12-07 | Fracture | 779.50 | 783.00 | 0 |
2009-02-10 | Perforation | 731.50 | 732.00 | 17 |
2009-02-10 | Perforation | 729.00 | 731.50 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 120 | 0.0 | 0.0 | 0.0 |
For data sources see[5]