If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304082206000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.582251,"lon":-111.053389,"icon":""}]} |
Location: 00/06-22-030-08W4/0 | |
Location Alias: 00/06-22-30-08 W4M | |
Location Alias 2: 00/06-22-030-08 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 08 | |
Section: 22 | |
County/Municipality: Special Areas No. 3 | |
Well Name: IMP CHINOOK 6-22-30-8 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0054594 | |
License Date: 1975-08-14 | |
License Status: RecCertified | |
Spud Date: 1975-07-19 | |
Final Drill Date: 1975-07-20 | |
Well Total Depth: 298.70 m | |
Surface Hole Latitude: 51.582251 | |
Surface Hole Longitude: -111.053389 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-07-20 | Finished Drilling |
1975-07-20 | Production Casing Operation Performed |
1975-07-20 | Well Mode changed to Drilled and Cased |
1975-08-14 | Obtained License |
1975-09-13 | Perforation Treatment Performed - Jet Perforation |
1976-03-04 | Well Began Production |
1976-03-04 | Well Fluid changed to Gas |
1976-03-04 | Well Mode changed to Flowing |
1977-06-22 | Perforation Treatment Performed - Jet Perforation |
1978-07-28 | Perforation Treatment Performed - Cement Plug |
1978-07-28 | Perforation Treatment Performed - Cement Squeeze |
1978-07-28 | Well Fluid changed to Gas |
1978-07-28 | Well Mode changed to Abandoned Zone |
2009-09-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-09-19 | Plug Back Performed |
2009-09-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-09-28 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-09-13 | Perforation | 287.10 | 289.00 | 13 |
1975-09-13 | Perforation | 266.40 | 268.20 | 13 |
1975-09-13 | Perforation | 231.00 | 232.60 | 13 |
1977-06-22 | Perforation | 137.20 | 138.40 | 7 |
1978-07-28 | Cement Squeeze | 231.00 | 232.60 | 0 |
1978-07-28 | Cement Plug | 210.30 | 222.50 | 0 |
2009-09-19 | Packing Device Capped w/Cement | 140.00 | 147.00 | 0 |
2009-09-20 | Packing Device Capped w/Cement | 126.00 | 134.00 | 0 |
2009-09-20 | Packing Device Capped w/Cement | 82.00 | 90.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1976 | 168 | 0.0 | 0.0 | 0.0 |
For data sources see[5]