X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304111506000

Well Details

Well ID: 0304111506000
Loading map...
Location: 00/06-15-030-11W4/0
Location Alias: 00/06-15-30-11 W4M
Location Alias 2: 00/06-15-030-11 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 11
Section: 15
County/Municipality: Special Areas No. 2
Well Name: SOC STANMORE 6-15-30-11
Operator Name: AlphaBow Energy Ltd.
License Number: 0038911
License Date: 1970-10-02
License Status: Abandoned
Spud Date: 1970-10-04
Final Drill Date: 1970-10-09
Well Total Depth: 1088.10 m
Surface Hole Latitude: 51.565681
Surface Hole Longitude: -111.473311

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-10-02 Obtained License
1970-10-07 Drill Stem Test Performed
1970-10-09 Finished Drilling
1970-10-09 Well Mode changed to Drilled and Cased
1970-10-10 Drill Stem Test Performed
1970-10-11 Production Casing Operation Performed
1970-10-27 Perforation Treatment Performed - Jet Perforation
1970-10-29 Well Began Production
1970-10-29 Well Fluid changed to Crude Oil
1970-10-29 Well Mode changed to Pumping
1983-12-02 Well Fluid changed to Crude Oil
1983-12-02 Well Mode changed to Suspended
1984-10-01 Well Fluid changed to Crude Oil
1984-10-01 Well Mode changed to Pumping
1986-01-27 Well Fluid changed to Crude Oil
1986-01-27 Well Mode changed to Suspended
1996-05-16 Well Log Performed
1996-05-17 Perforation Treatment Performed - Jet Perforation
1996-05-17 Well Log Performed
1996-05-18 Well Log Performed
1996-05-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-05-19 Perforation Treatment Performed - Jet Perforation
1996-05-19 Plug Back Performed
1996-05-19 Well Fluid changed to Crude Oil
1996-05-19 Well Mode changed to Abandoned Zone
1996-05-21 Well Log Performed
1996-05-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-05-22 Plug Back Performed
1996-05-27 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-10-27 Perforation 879.70 882.10 13
1970-10-27 Perforation 883.30 885.10 13
1970-10-27 Perforation 1042.10 1043.60 13
1996-05-17 Perforation 1063.80 1064.80 13
1996-05-19 Packing Device Capped w/Cement 1000.00 1008.00 0
1996-05-19 Packing Device Capped w/Cement 857.00 865.00 0
1996-05-19 Perforation 385.80 390.80 13
1996-05-22 Packing Device Capped w/Cement 362.00 370.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 853 0.0 0.0 0.0
1971 2555 0.0 0.0 0.0
1972 4030 0.0 0.0 0.0
1973 8663 0.0 0.0 0.0
1974 3960 0.0 0.0 0.0
1975 5270 0.0 0.0 0.0
1976 7990 0.0 0.0 0.0
1977 8413 0.0 0.0 0.0
1978 7552 0.0 0.0 0.0
1979 7290 0.0 0.0 0.0
1980 7449 0.0 0.0 0.0
1981 6441 0.0 0.0 0.0
1982 4693 0.0 0.0 0.0
1983 7478 0.0 0.0 0.0
1984 127 0.0 0.0 0.0

For data sources see[5]

References