X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304132001003

Well Details

Well ID: 0304132001003
Loading map...
Location: 00/01-20-030-13W4/3
Location Alias: 00/01-20-30-13 W4M
Location Alias 2: 00/01-20-030-13 W4/03
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 13
Section: 20
County/Municipality: Special Areas No. 2
Well Name: SOC RICHDALE 1-20-30-13
Operator Name: AlphaBow Energy Ltd.
License Number: 0175112
License Date: 1995-01-19
License Status: Issued
Spud Date: 1995-05-27
Final Drill Date: 1995-05-31
Well Total Depth: 1187.00 m
Surface Hole Latitude: 51.578121
Surface Hole Longitude: -111.790429

For data sources see[1][2]

Well History

Date Event
1995-01-19 Obtained License
1995-05-28 Surface Casing Operation Performed
1995-05-29 Direction Drilling Operation Performed - Deviate
1995-05-31 Finished Drilling
1995-05-31 Well Log Performed
1995-05-31 Well Mode changed to Drilled and Cased
1995-06-01 Drill Stem Test Performed
1995-06-02 Production Casing Operation Performed
1995-06-02 Rig Released
1995-06-09 Perforation Treatment Performed - Jet Perforation
1995-08-25 Well Log Performed
2004-01-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-01-05 Plug Back Performed
2004-01-05 Well Log Performed
2004-01-06 Perforation Treatment Performed - Jet Perforation
2004-01-06 Well Log Performed
2004-01-12 Perforation Treatment Performed - Fractured
2004-01-15 Perforation Treatment Performed - Jet Perforation
2004-01-18 Well Began Production
2004-01-18 Well Fluid changed to Gas
2004-01-18 Well Mode changed to Flowing
2018-08-01 Well Fluid changed to Gas
2018-08-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-05-29 643.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-06-09 Perforation 1165.00 1166.00 13
2004-01-05 Packing Device Capped w/Cement 1144.00 1152.00 0
2004-01-06 Perforation 1135.00 1141.00 17
2004-01-12 Fracture 1135.00 1141.00 0
2004-01-15 Perforation 994.00 995.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 8253 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8106 0.0 0.0 0.0
2007 8716 0.0 0.0 0.0
2008 8775 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8687 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8687 0.0 0.0 0.0
2017 8640 0.0 0.0 0.0
2018 3023 0.0 0.0 0.0

For data sources see[6]

References