X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304133410003

Well Details

Well ID: 0304133410003
Loading map...
Location: 00/10-34-030-13W4/3
Location Alias: 00/10-34-30-13 W4M
Location Alias 2: 00/10-34-030-13 W4/03
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 13
Section: 34
County/Municipality: Special Areas No. 2
Well Name: SOC RICHDALE 10-34-30-13
Operator Name: AlphaBow Energy Ltd.
License Number: 0056484
License Date: 1976-01-07
License Status: Suspension
Spud Date: 1976-01-15
Final Drill Date: 1976-01-26
Well Total Depth: 1140.00 m
Surface Hole Latitude: 51.615955
Surface Hole Longitude: -111.745877

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-01-07 Obtained License
1976-01-19 Drill Stem Test Performed
1976-01-22 Drill Stem Test Performed
1976-01-24 Drill Stem Test Performed
1976-01-25 Drill Stem Test Performed
1976-01-26 Finished Drilling
1976-01-26 Production Casing Operation Performed
1976-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-01-31 Perforation Treatment Performed - Jet Perforation
1976-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-02-03 Perforation Treatment Performed - Fractured
1976-05-27 Perforation Treatment Performed - Jet Perforation
1976-05-28 Perforation Treatment Performed - Casing Patch (Over Perfs)
1976-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-07-20 Well Mode changed to Drilled and Cased
1977-12-15 Well Began Production
1977-12-15 Well Fluid changed to Gas
1977-12-15 Well Mode changed to Flowing
1983-01-01 Well Fluid changed to Gas
1983-01-01 Well Mode changed to Suspended
1983-09-11 Well Fluid changed to Gas
1983-09-11 Well Mode changed to Flowing
1984-09-11 Perforation Treatment Performed - Jet Perforation
1984-09-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-09-13 Plug Back Performed
1984-09-23 Well Log Performed
1998-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-12-17 Well Log Performed
1998-12-19 Perforation Treatment Performed - Jet Perforation
2015-05-01 Well Fluid changed to Gas
2015-05-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-01-31 Perforation 948.80 950.70 7
1984-09-11 Perforation 948.80 950.70 7
1984-09-11 Perforation 952.20 953.40 7
1984-09-13 Packing Device Capped w/Cement 1113.00 1115.00 0
1998-10-28 Acid Treatment 1105.20 1111.30 0
1998-12-19 Perforation 1107.80 1110.80 13
1976-01-31 Perforation 952.20 953.40 7
1976-01-31 Acid Treatment 948.80 953.40 0
1976-02-02 Acid Treatment 948.80 953.40 0
1976-02-03 Fracture 948.80 953.40 0
1976-05-27 Perforation 1105.20 1111.30 7
1976-05-27 Perforation 1116.20 1118.60 7
1976-05-28 Casing Patch 946.40 956.20 0
1976-05-31 Acid Treatment 1105.20 1118.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 0 0.0 0.0 0.0
1977 27 0.0 0.0 0.0
1978 3202 0.0 0.0 0.0
1979 7264 0.0 0.0 0.0
1980 7040 0.0 0.0 0.0
1981 7319 0.0 0.0 0.0
1982 380 0.0 0.0 0.0
1983 1193 0.0 0.0 0.0
1984 704 0.0 0.0 0.0
1985 716 0.0 0.0 0.0
1986 221 0.0 0.0 0.0
1987 2881 0.0 0.0 0.0
1988 4152 0.0 0.0 0.0
1989 4659 0.0 0.0 0.0
1990 3923 0.0 0.0 0.0
1991 7015 0.0 0.0 0.0
1992 7761 0.0 0.0 0.0
1993 8458 0.0 0.0 0.0
1994 8512 0.0 0.0 0.0
1995 8758 0.0 0.0 0.0
1996 8443 0.0 0.0 0.0
1997 8758 0.0 0.0 0.0
1998 7581 0.0 0.0 0.0
1999 8686 0.0 0.0 0.0
2000 8631 0.0 0.0 0.0
2001 8641 0.0 0.0 0.0
2002 7545 0.0 0.0 0.0
2003 8755 0.0 0.0 0.0
2004 8650 0.0 0.0 0.0
2005 8101 0.0 0.0 0.0
2006 8410 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8666 0.0 0.0 0.0
2009 3686 0.0 0.0 0.0
2010 18 0.0 0.0 0.0
2011 24 0.0 0.0 0.0

For data sources see[5]

References