X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304152107002

Well Details

Well ID: 0304152107002
Loading map...
Location: 00/07-21-030-15W4/2
Location Alias: 00/07-21-30-15 W4M
Location Alias 2: 00/07-21-030-15 W4/02
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 15
Section: 21
County/Municipality: Special Areas No. 2
Well Name: TRAVERSE WATTS 7-21-30-15
Operator Name: Traverse Energy Ltd.
License Number: 0482090
License Date: 2016-12-21
License Status: Abandoned
Spud Date: 2017-01-24
Final Drill Date: 2017-01-27
Well Total Depth: 1331.00 m
Surface Hole Latitude: 51.584420
Surface Hole Longitude: -112.057634

For data sources see[1][2]

Well History

Date Event
2016-12-21 Obtained License
2017-01-24 Surface Casing Operation Performed
2017-01-25 Direction Drilling Operation Performed - Deviate
2017-01-27 Finished Drilling
2017-01-27 Well Mode changed to Drilled and Cased
2017-01-28 Production Casing Operation Performed
2017-01-28 Well Log Performed
2017-01-29 Rig Released
2017-02-05 Perforation Treatment Performed - Jet Perforation
2017-02-28 Perforation Treatment Performed - Bridge Plug No Cement Required
2017-02-28 Perforation Treatment Performed - Jet Perforation
2017-05-13 Perforation Treatment Performed - Fractured
2017-08-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-08-24 Perforation Treatment Performed - Jet Perforation
2017-08-24 Plug Back Performed
2017-08-24 Well Mode changed to Abandoned Zone
2017-09-18 Perforation Treatment Performed - Jet Perforation
2017-09-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-09-21 Plug Back Performed
2018-02-28 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2017-01-25 224.60 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-02-05 Perforation 1287.00 1290.00 17
2017-02-28 Perforation 1275.40 1277.40 17
2017-02-28 Bridge Plug, No Cement 1284.70 1285.00 0
2017-05-13 Fracture 1275.40 1277.40 0
2017-08-24 Perforation 1088.00 1091.00 17
2017-08-24 Packing Device Capped w/Cement 1265.00 1273.00 0
2017-09-18 Perforation 1175.50 1177.00 17
2017-09-21 Packing Device Capped w/Cement 1163.00 1171.00 0
2017-09-21 Packing Device Capped w/Cement 1072.00 1080.00 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-25 No Incident Encountered 0.00 0.00
2017-02-05 No Incident Encountered 0.00 0.00
2017-02-28 No Incident Encountered 0.00 0.00
2017-08-24 No Incident Encountered 0.00 0.00
2017-09-18 No Incident Encountered 0.00 0.00

For data sources see[6]

References