X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304221611002

Well Details

Well ID: 0304221611002
Loading map...
Location: 00/11-16-030-22W4/2
Location Alias: 00/11-16-30-22 W4M
Location Alias 2: 00/11-16-030-22 W4/02
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 22
Section: 16
County/Municipality: Kneehill County
Well Name: PINE CLIFF GPINE 11-16-30-22
Operator Name: Pine Cliff Energy Ltd.
License Number: 0244032
License Date: 2000-11-04
License Status: Issued
Spud Date: 2000-11-15
Final Drill Date: 2000-11-26
Well Total Depth: 1840.00 m
Surface Hole Latitude: 51.569150
Surface Hole Longitude: -113.049626

For data sources see[1][2]

Well History

Date Event
2000-11-04 Obtained License
2000-11-17 Surface Casing Operation Performed
2000-11-21 Direction Drilling Operation Performed - Horizontal
2000-11-26 Finished Drilling
2000-11-26 Production Casing Operation Performed
2000-11-26 Well Mode changed to Drilled and Cased
2000-11-27 Rig Released
2001-01-02 Perforation Treatment Performed - Open-Hole Completion
2001-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-10-23 Well Log Performed
2002-01-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-13 Plug Back Performed
2002-01-14 Perforation Treatment Performed - Jet Perforation
2002-01-14 Well Log Performed
2003-01-31 Well Began Production
2003-01-31 Well Fluid changed to Gas
2003-01-31 Well Mode changed to Flowing
2008-01-01 Well Fluid changed to Gas
2008-01-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-11-21 1280.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-01-02 Open Hole/Barefoot Completion 1598.00 1840.00 0
2001-02-05 Acid Treatment 1598.00 1840.00 0
2002-01-13 Packing Device Capped w/Cement 1544.00 1592.00 0
2002-01-14 Perforation 1478.00 1483.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 8036 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 7671 0.0 0.0 0.0
2006 4332 0.0 0.0 0.0
2007 4761 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8231 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 7496 0.0 0.0 0.0
2012 7973 0.0 0.0 0.0
2013 8121 0.0 0.0 0.0
2014 8638 0.0 0.0 0.0
2015 8678 0.0 0.0 0.0
2016 8711 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References