If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0304230808000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.553823,"lon":-113.196218,"icon":""}]} |
| Location: 00/08-08-030-23W4/0 | |
| Location Alias: 00/08-08-30-23 W4M | |
| Location Alias 2: 00/08-08-030-23 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 030 | |
| Meridian: 4 | |
| Range: 23 | |
| Section: 08 | |
| County/Municipality: Kneehill County | |
| Well Name: EMBER GPINE 8-8-30-23 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0336579 | |
| License Date: 2005-08-17 | |
| License Status: Issued | |
| Spud Date: 2005-09-03 | |
| Final Drill Date: 2005-09-05 | |
| Well Total Depth: 898.00 m | |
| Surface Hole Latitude: 51.553823 | |
| Surface Hole Longitude: -113.196218 |
| Date | Event |
|---|---|
| 2005-08-17 | Obtained License |
| 2005-09-04 | Surface Casing Operation Performed |
| 2005-09-05 | Finished Drilling |
| 2005-09-05 | Production Casing Operation Performed |
| 2005-09-05 | Rig Released |
| 2005-09-05 | Well Mode changed to Drilled and Cased |
| 2005-09-23 | Well Log Performed |
| 2005-10-06 | Perforation Treatment Performed - Jet Perforation |
| 2005-10-17 | Perforation Treatment Performed - Jet Perforation |
| 2005-10-18 | Perforation Treatment Performed - Jet Perforation |
| 2005-10-25 | Perforation Treatment Performed - Fractured |
| 2005-12-06 | Well Began Production |
| 2005-12-06 | Well Fluid changed to Gas |
| 2005-12-06 | Well Mode changed to Flowing |
| 2008-01-19 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2008-01-19 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2005-10-06 | Perforation | 693.70 | 696.20 | 14 |
| 2005-10-17 | Perforation | 513.90 | 514.40 | 14 |
| 2005-10-17 | Perforation | 520.00 | 520.50 | 14 |
| 2005-10-17 | Perforation | 526.10 | 527.60 | 14 |
| 2005-10-18 | Perforation | 177.50 | 178.00 | 14 |
| 2005-10-18 | Perforation | 217.60 | 218.10 | 14 |
| 2005-10-18 | Perforation | 296.70 | 297.20 | 14 |
| 2005-10-18 | Perforation | 279.60 | 280.10 | 14 |
| 2005-10-18 | Perforation | 354.10 | 355.10 | 14 |
| 2005-10-18 | Perforation | 391.00 | 393.00 | 14 |
| 2005-10-18 | Perforation | 393.50 | 394.50 | 14 |
| 2005-10-06 | Perforation | 834.80 | 836.30 | 14 |
| 2005-10-18 | Perforation | 415.50 | 416.50 | 14 |
| 2005-10-25 | Fracture | 834.80 | 836.30 | 0 |
| 2005-10-25 | Fracture | 693.70 | 696.20 | 0 |
| 2005-10-25 | Fracture | 526.10 | 527.60 | 0 |
| 2005-10-25 | Fracture | 520.00 | 520.50 | 0 |
| 2005-10-25 | Fracture | 513.90 | 514.40 | 0 |
| 2005-10-25 | Fracture | 505.00 | 507.00 | 0 |
| 2005-10-25 | Fracture | 489.00 | 490.00 | 0 |
| 2005-10-25 | Fracture | 457.50 | 458.50 | 0 |
| 2005-10-25 | Fracture | 448.00 | 452.00 | 0 |
| 2005-10-17 | Perforation | 419.70 | 420.20 | 14 |
| 2005-10-25 | Fracture | 443.00 | 445.00 | 0 |
| 2005-10-25 | Fracture | 415.50 | 420.20 | 0 |
| 2005-10-25 | Fracture | 391.00 | 394.50 | 0 |
| 2005-10-25 | Fracture | 354.10 | 355.10 | 0 |
| 2005-10-25 | Fracture | 296.70 | 297.20 | 0 |
| 2005-10-25 | Fracture | 279.60 | 280.10 | 0 |
| 2005-10-25 | Fracture | 217.60 | 218.10 | 0 |
| 2005-10-25 | Fracture | 177.50 | 178.00 | 0 |
| 2005-10-17 | Perforation | 443.00 | 445.00 | 14 |
| 2005-10-17 | Perforation | 448.00 | 449.00 | 14 |
| 2005-10-17 | Perforation | 450.50 | 452.00 | 14 |
| 2005-10-17 | Perforation | 457.50 | 458.50 | 14 |
| 2005-10-17 | Perforation | 489.00 | 490.00 | 14 |
| 2005-10-17 | Perforation | 505.50 | 507.00 | 14 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2005 | 618 | 0.0 | 0.0 | 0.0 |
| 2006 | 8759 | 0.0 | 0.0 | 0.0 |
| 2007 | 4343 | 0.0 | 0.0 | 0.0 |
| 2008 | 8039 | 0.0 | 0.0 | 0.0 |
| 2009 | 8759 | 0.0 | 0.0 | 0.0 |
| 2010 | 8759 | 0.0 | 0.0 | 0.0 |
| 2011 | 8759 | 0.0 | 0.0 | 0.0 |
| 2012 | 8602 | 0.0 | 0.0 | 0.0 |
| 2013 | 8759 | 0.0 | 0.0 | 0.0 |
| 2014 | 8751 | 0.0 | 0.0 | 0.0 |
| 2015 | 8755 | 0.0 | 0.0 | 0.0 |
| 2016 | 8778 | 0.0 | 0.0 | 0.0 |
| 2017 | 8696 | 0.0 | 0.0 | 0.0 |
| 2018 | 8701 | 0.0 | 0.0 | 0.0 |
| 2019 | 8577 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]