If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0304241216000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.558551,"lon":-113.245605,"icon":""}]} |
| Location: 00/16-12-030-24W4/0 | |
| Location Alias: 00/16-12-30-24 W4M | |
| Location Alias 2: 00/16-12-030-24 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 030 | |
| Meridian: 4 | |
| Range: 24 | |
| Section: 12 | |
| County/Municipality: Kneehill County | |
| Well Name: EMBER TWINING 16-12-30-24 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0335472 | |
| License Date: 2005-07-27 | |
| License Status: Issued | |
| Spud Date: 2005-08-03 | |
| Final Drill Date: 2005-08-30 | |
| Well Total Depth: 861.00 m | |
| Surface Hole Latitude: 51.558551 | |
| Surface Hole Longitude: -113.245605 |
| Date | Event |
|---|---|
| 2005-07-27 | Obtained License |
| 2005-08-05 | Surface Casing Operation Performed |
| 2005-08-30 | Finished Drilling |
| 2005-08-30 | Production Casing Operation Performed |
| 2005-08-30 | Rig Released |
| 2005-08-30 | Well Mode changed to Drilled and Cased |
| 2005-09-06 | Well Log Performed |
| 2005-09-21 | Perforation Treatment Performed - Jet Perforation |
| 2005-10-04 | Perforation Treatment Performed - Jet Perforation |
| 2005-10-06 | Perforation Treatment Performed - Fractured |
| 2005-12-15 | Well Began Production |
| 2005-12-15 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2005-12-15 | Well Mode changed to Flowing |
| 2019-01-30 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2019-01-30 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2005-09-21 | Perforation | 640.90 | 642.90 | 14 |
| 2005-10-04 | Perforation | 433.00 | 435.00 | 14 |
| 2005-10-04 | Perforation | 437.00 | 440.00 | 14 |
| 2005-10-04 | Perforation | 459.80 | 460.30 | 14 |
| 2005-10-04 | Perforation | 484.70 | 485.70 | 14 |
| 2005-10-04 | Perforation | 491.70 | 492.20 | 14 |
| 2005-10-04 | Perforation | 497.50 | 498.00 | 14 |
| 2005-10-04 | Perforation | 509.10 | 510.10 | 14 |
| 2005-10-04 | Perforation | 527.50 | 528.00 | 14 |
| 2005-10-06 | Fracture | 509.10 | 510.10 | 0 |
| 2005-10-06 | Fracture | 497.50 | 498.00 | 0 |
| 2005-09-21 | Perforation | 749.00 | 750.50 | 14 |
| 2005-10-06 | Fracture | 491.70 | 492.20 | 0 |
| 2005-10-06 | Fracture | 484.70 | 485.70 | 0 |
| 2005-10-06 | Fracture | 459.80 | 460.30 | 0 |
| 2005-10-06 | Fracture | 437.50 | 440.00 | 0 |
| 2005-10-06 | Fracture | 433.00 | 435.00 | 0 |
| 2005-10-06 | Fracture | 426.00 | 429.50 | 0 |
| 2005-10-06 | Fracture | 415.20 | 416.20 | 0 |
| 2005-10-06 | Fracture | 387.50 | 388.00 | 0 |
| 2005-10-06 | Fracture | 381.00 | 382.00 | 0 |
| 2005-10-06 | Fracture | 360.00 | 361.00 | 0 |
| 2005-10-04 | Perforation | 350.00 | 352.00 | 14 |
| 2005-10-06 | Fracture | 350.00 | 352.00 | 0 |
| 2005-10-06 | Fracture | 527.50 | 528.00 | 0 |
| 2005-10-06 | Fracture | 354.00 | 355.00 | 0 |
| 2005-10-04 | Perforation | 354.00 | 355.00 | 14 |
| 2005-10-04 | Perforation | 360.00 | 361.00 | 14 |
| 2005-10-04 | Perforation | 381.00 | 382.00 | 14 |
| 2005-10-04 | Perforation | 387.50 | 388.00 | 14 |
| 2005-10-04 | Perforation | 415.20 | 416.20 | 14 |
| 2005-10-04 | Perforation | 426.00 | 429.50 | 14 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2005 | 397 | 0.0 | 0.0 | 0.0 |
| 2006 | 6167 | 0.0 | 0.0 | 0.0 |
| 2009 | 1464 | 0.0 | 0.0 | 0.0 |
| 2010 | 8759 | 0.0 | 0.0 | 0.0 |
| 2011 | 8015 | 0.0 | 0.0 | 0.0 |
| 2012 | 8616 | 0.0 | 0.0 | 0.0 |
| 2013 | 8759 | 0.0 | 0.0 | 0.0 |
| 2014 | 8751 | 0.0 | 0.0 | 0.0 |
| 2015 | 8754 | 0.0 | 0.0 | 0.0 |
| 2016 | 8778 | 0.0 | 0.0 | 0.0 |
| 2017 | 8696 | 0.0 | 0.0 | 0.0 |
| 2018 | 8701 | 0.0 | 0.0 | 0.0 |
| 2019 | 8217 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]