If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0304242812000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.62396,"lon":-113.338256,"icon":""}]} |
| Location: 00/12-28-030-24W4/0 | |
| Location Alias: 00/12-28-30-24 W4M | |
| Location Alias 2: 00/12-28-030-24 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 030 | |
| Meridian: 4 | |
| Range: 24 | |
| Section: 28 | |
| County/Municipality: Kneehill County | |
| Well Name: ARTIS HZ TWINING 12-28-30-24 | |
| Operator Name: Artis Exploration Ltd. | |
| License Number: 0492077 | |
| License Date: 2018-11-15 | |
| License Status: Amended | |
| Spud Date: 2018-11-18 | |
| Final Drill Date: 2018-11-28 | |
| Well Total Depth: 5115.00 m | |
| Surface Hole Latitude: 51.623960 | |
| Surface Hole Longitude: -113.338256 |
| Date | Event |
|---|---|
| 2018-11-15 | Obtained License |
| 2018-11-19 | Surface Casing Operation Performed |
| 2018-11-21 | Direction Drilling Operation Performed - Deviate |
| 2018-11-23 | Direction Drilling Operation Performed - Horizontal |
| 2018-11-28 | Finished Drilling |
| 2018-11-28 | Well Log Performed |
| 2018-11-28 | Well Mode changed to Drilled and Cased |
| 2018-11-29 | Production Casing Operation Performed |
| 2018-11-30 | Rig Released |
| 2018-12-21 | Well Log Performed |
| 2019-01-03 | Perforation Treatment Performed - Jet Perforation |
| 2019-01-10 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-01-11 | Perforation Treatment Performed - Jet Perforation |
| 2019-01-11 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-01-12 | Perforation Treatment Performed - Jet Perforation |
| 2019-01-12 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-01-13 | Perforation Treatment Performed - Jet Perforation |
| 2019-01-13 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-01-14 | Perforation Treatment Performed - Jet Perforation |
| 2019-01-14 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-01-15 | Perforation Treatment Performed - Jet Perforation |
| 2019-01-15 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-01-16 | Perforation Treatment Performed - Jet Perforation |
| 2019-01-16 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-01-16 | Well Began Production |
| 2019-01-16 | Well Fluid changed to Crude Oil |
| 2019-01-16 | Well Mode changed to Flowing |
| 2019-01-17 | Perforation Treatment Performed - Jet Perforation |
| 2019-01-17 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-01-18 | Perforation Treatment Performed - Jet Perforation |
| 2019-01-18 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2019-01-19 | Perforation Treatment Performed - Jet Perforation |
| 2019-01-19 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2018-11-21 | 1982.80 | Deviate (5 - 79 degrees) |
| 2018-11-23 | 2410.60 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2019-01-03 | Perforation | 4996.70 | 4997.30 | 8 |
| 2019-01-11 | Perforation | 4895.00 | 4895.50 | 11 |
| 2019-01-15 | Perforation | 3815.00 | 3815.50 | 11 |
| 2019-01-15 | Perforation | 3800.00 | 3800.50 | 11 |
| 2019-01-15 | Perforation | 3785.00 | 3785.50 | 11 |
| 2019-01-15 | Multi-Stage Fracture | 3785.00 | 3830.50 | 0 |
| 2019-01-15 | Perforation | 3770.00 | 3770.50 | 11 |
| 2019-01-15 | Perforation | 3755.00 | 3755.50 | 11 |
| 2019-01-15 | Perforation | 3740.00 | 3740.50 | 11 |
| 2019-01-15 | Perforation | 3725.00 | 3725.50 | 11 |
| 2019-01-15 | Multi-Stage Fracture | 3725.00 | 3770.50 | 0 |
| 2019-01-16 | Perforation | 3710.00 | 3710.50 | 11 |
| 2019-01-11 | Perforation | 4880.00 | 4880.50 | 11 |
| 2019-01-16 | Perforation | 3695.00 | 3695.50 | 11 |
| 2019-01-16 | Perforation | 3680.00 | 3680.50 | 11 |
| 2019-01-16 | Multi-Stage Fracture | 3665.00 | 3710.50 | 0 |
| 2019-01-16 | Perforation | 3655.00 | 3655.50 | 11 |
| 2019-01-16 | Perforation | 3650.00 | 3650.50 | 11 |
| 2019-01-16 | Perforation | 3635.00 | 3635.50 | 11 |
| 2019-01-16 | Perforation | 3620.00 | 3620.50 | 11 |
| 2019-01-16 | Perforation | 3605.00 | 3605.50 | 11 |
| 2019-01-16 | Multi-Stage Fracture | 3605.00 | 3650.50 | 0 |
| 2019-01-16 | Perforation | 3590.00 | 3590.50 | 11 |
| 2019-01-11 | Perforation | 4865.00 | 4865.50 | 11 |
| 2019-01-16 | Perforation | 3575.00 | 3575.50 | 11 |
| 2019-01-16 | Perforation | 3560.00 | 3560.50 | 11 |
| 2019-01-16 | Perforation | 3545.00 | 3545.50 | 11 |
| 2019-01-16 | Multi-Stage Fracture | 3545.00 | 3590.50 | 0 |
| 2019-01-16 | Perforation | 3530.00 | 3530.50 | 11 |
| 2019-01-16 | Perforation | 3515.00 | 3515.50 | 11 |
| 2019-01-16 | Perforation | 3500.00 | 3500.50 | 11 |
| 2019-01-16 | Perforation | 3485.00 | 3485.50 | 11 |
| 2019-01-16 | Multi-Stage Fracture | 3485.00 | 3530.50 | 0 |
| 2019-01-16 | Perforation | 3470.00 | 3470.50 | 11 |
| 2019-01-11 | Multi-Stage Fracture | 4865.00 | 4910.50 | 0 |
| 2019-01-16 | Perforation | 3455.00 | 3455.50 | 11 |
| 2019-01-16 | Perforation | 3440.00 | 3440.50 | 11 |
| 2019-01-16 | Perforation | 3425.00 | 3425.50 | 11 |
| 2019-01-16 | Multi-Stage Fracture | 3425.00 | 3470.50 | 0 |
| 2019-01-16 | Perforation | 3410.00 | 3410.50 | 11 |
| 2019-01-16 | Perforation | 3395.00 | 3395.50 | 11 |
| 2019-01-16 | Perforation | 3380.00 | 3380.50 | 11 |
| 2019-01-16 | Perforation | 3365.00 | 3365.50 | 11 |
| 2019-01-17 | Multi-Stage Fracture | 3365.00 | 3410.50 | 0 |
| 2019-01-17 | Perforation | 3350.00 | 3350.50 | 11 |
| 2019-01-11 | Perforation | 4850.00 | 4850.50 | 11 |
| 2019-01-17 | Perforation | 3335.00 | 3335.50 | 11 |
| 2019-01-17 | Perforation | 3320.00 | 3320.50 | 11 |
| 2019-01-17 | Perforation | 3305.00 | 3305.50 | 11 |
| 2019-01-17 | Multi-Stage Fracture | 3305.00 | 3350.50 | 0 |
| 2019-01-17 | Perforation | 3290.00 | 3290.50 | 11 |
| 2019-01-17 | Perforation | 3275.00 | 3275.50 | 11 |
| 2019-01-17 | Perforation | 3260.00 | 3260.50 | 11 |
| 2019-01-17 | Perforation | 3245.00 | 3245.50 | 11 |
| 2019-01-17 | Multi-Stage Fracture | 3245.00 | 3290.50 | 0 |
| 2019-01-17 | Perforation | 3230.00 | 3230.50 | 11 |
| 2019-01-11 | Perforation | 4835.00 | 4835.50 | 11 |
| 2019-01-17 | Perforation | 3215.00 | 3215.50 | 11 |
| 2019-01-17 | Perforation | 3200.00 | 3200.50 | 11 |
| 2019-01-17 | Perforation | 3185.00 | 3185.50 | 11 |
| 2019-01-17 | Multi-Stage Fracture | 3185.00 | 3230.50 | 0 |
| 2019-01-17 | Perforation | 3170.00 | 3170.50 | 11 |
| 2019-01-17 | Perforation | 3155.00 | 3155.50 | 11 |
| 2019-01-17 | Perforation | 3140.00 | 3140.50 | 11 |
| 2019-01-17 | Perforation | 3125.00 | 3125.50 | 11 |
| 2019-01-17 | Multi-Stage Fracture | 3125.00 | 3170.50 | 0 |
| 2019-01-17 | Perforation | 3110.00 | 3110.50 | 11 |
| 2019-01-11 | Perforation | 4820.00 | 4820.50 | 11 |
| 2019-01-17 | Perforation | 3095.00 | 3095.50 | 11 |
| 2019-01-17 | Perforation | 3080.00 | 3080.50 | 11 |
| 2019-01-17 | Perforation | 3065.00 | 3065.50 | 11 |
| 2019-01-17 | Multi-Stage Fracture | 3065.00 | 3110.50 | 0 |
| 2019-01-18 | Perforation | 3050.00 | 3050.50 | 11 |
| 2019-01-18 | Perforation | 3035.00 | 3035.50 | 11 |
| 2019-01-18 | Perforation | 3020.00 | 3020.50 | 11 |
| 2019-01-18 | Perforation | 3005.00 | 3005.50 | 11 |
| 2019-01-18 | Multi-Stage Fracture | 3005.00 | 3050.50 | 0 |
| 2019-01-18 | Perforation | 2990.00 | 2990.50 | 11 |
| 2019-01-11 | Perforation | 4805.00 | 4805.50 | 11 |
| 2019-01-18 | Perforation | 2975.00 | 2975.50 | 11 |
| 2019-01-18 | Perforation | 2960.00 | 2960.50 | 11 |
| 2019-01-18 | Perforation | 2945.00 | 2945.50 | 11 |
| 2019-01-18 | Multi-Stage Fracture | 2945.00 | 2990.50 | 0 |
| 2019-01-18 | Perforation | 2930.00 | 2930.50 | 11 |
| 2019-01-18 | Perforation | 2915.00 | 2915.50 | 11 |
| 2019-01-18 | Perforation | 2900.00 | 2900.50 | 11 |
| 2019-01-18 | Perforation | 2885.00 | 2885.50 | 11 |
| 2019-01-18 | Multi-Stage Fracture | 2885.00 | 2930.50 | 0 |
| 2019-01-18 | Perforation | 2870.00 | 2870.50 | 11 |
| 2019-01-11 | Multi-Stage Fracture | 4805.00 | 4850.50 | 0 |
| 2019-01-18 | Perforation | 2855.00 | 2855.50 | 11 |
| 2019-01-18 | Perforation | 2840.00 | 2840.50 | 11 |
| 2019-01-18 | Perforation | 2825.00 | 2825.50 | 11 |
| 2019-01-18 | Multi-Stage Fracture | 2825.00 | 2870.50 | 0 |
| 2019-01-18 | Perforation | 2810.00 | 2810.50 | 11 |
| 2019-01-18 | Perforation | 2795.00 | 2795.50 | 11 |
| 2019-01-18 | Perforation | 2780.00 | 2780.50 | 11 |
| 2019-01-18 | Perforation | 2765.00 | 2765.50 | 11 |
| 2019-01-18 | Multi-Stage Fracture | 2765.00 | 2810.50 | 0 |
| 2019-01-18 | Perforation | 2750.00 | 2750.50 | 11 |
| 2019-01-11 | Perforation | 4790.00 | 4790.50 | 11 |
| 2019-01-18 | Perforation | 2735.00 | 2735.50 | 11 |
| 2019-01-18 | Perforation | 2720.00 | 2720.50 | 11 |
| 2019-01-18 | Perforation | 2705.00 | 2705.50 | 11 |
| 2019-01-19 | Multi-Stage Fracture | 2705.00 | 2750.50 | 0 |
| 2019-01-19 | Perforation | 2690.00 | 2690.50 | 11 |
| 2019-01-19 | Perforation | 2675.00 | 2675.50 | 11 |
| 2019-01-19 | Perforation | 2660.00 | 2660.50 | 11 |
| 2019-01-19 | Perforation | 2645.00 | 2645.50 | 11 |
| 2019-01-19 | Multi-Stage Fracture | 2645.00 | 2690.50 | 0 |
| 2019-01-03 | Perforation | 4981.70 | 4982.30 | 8 |
| 2019-01-11 | Perforation | 4775.00 | 4775.50 | 11 |
| 2019-01-11 | Perforation | 4760.00 | 4760.50 | 11 |
| 2019-01-11 | Perforation | 4745.00 | 4745.50 | 11 |
| 2019-01-12 | Multi-Stage Fracture | 4745.00 | 4790.50 | 0 |
| 2019-01-12 | Perforation | 4730.00 | 4730.50 | 11 |
| 2019-01-12 | Perforation | 4715.00 | 4715.50 | 11 |
| 2019-01-12 | Perforation | 4700.00 | 4700.50 | 11 |
| 2019-01-12 | Perforation | 4685.00 | 4685.50 | 11 |
| 2019-01-12 | Multi-Stage Fracture | 4685.00 | 4730.50 | 0 |
| 2019-01-12 | Perforation | 4670.00 | 4670.50 | 11 |
| 2019-01-10 | Multi-Stage Fracture | 4981.70 | 4997.30 | 0 |
| 2019-01-12 | Perforation | 4655.00 | 4655.50 | 11 |
| 2019-01-12 | Perforation | 4640.00 | 4640.50 | 11 |
| 2019-01-12 | Perforation | 4625.00 | 4625.50 | 11 |
| 2019-01-12 | Multi-Stage Fracture | 4625.00 | 4670.50 | 0 |
| 2019-01-12 | Perforation | 4610.00 | 4610.50 | 11 |
| 2019-01-12 | Perforation | 4595.00 | 4595.50 | 11 |
| 2019-01-12 | Perforation | 4580.00 | 4580.50 | 11 |
| 2019-01-12 | Perforation | 4565.00 | 4565.50 | 11 |
| 2019-01-12 | Multi-Stage Fracture | 4565.00 | 4610.50 | 0 |
| 2019-01-12 | Perforation | 4550.00 | 4550.50 | 11 |
| 2019-01-11 | Perforation | 4972.00 | 4972.50 | 11 |
| 2019-01-12 | Perforation | 4535.00 | 4535.50 | 11 |
| 2019-01-12 | Perforation | 4520.00 | 4520.50 | 11 |
| 2019-01-12 | Perforation | 4505.00 | 4505.50 | 11 |
| 2019-01-12 | Multi-Stage Fracture | 4505.00 | 4550.50 | 0 |
| 2019-01-13 | Perforation | 4490.00 | 4490.50 | 11 |
| 2019-01-13 | Perforation | 4475.00 | 4475.50 | 11 |
| 2019-01-13 | Perforation | 4460.00 | 4460.50 | 11 |
| 2019-01-13 | Perforation | 4445.00 | 4445.50 | 11 |
| 2019-01-13 | Multi-Stage Fracture | 4445.00 | 4490.50 | 0 |
| 2019-01-13 | Perforation | 4430.00 | 4430.50 | 11 |
| 2019-01-11 | Perforation | 4955.00 | 4955.50 | 11 |
| 2019-01-13 | Perforation | 4415.00 | 4415.50 | 11 |
| 2019-01-13 | Perforation | 4400.00 | 4400.50 | 11 |
| 2019-01-13 | Perforation | 4385.00 | 4385.50 | 11 |
| 2019-01-13 | Multi-Stage Fracture | 4385.00 | 4430.50 | 0 |
| 2019-01-13 | Perforation | 4370.00 | 4370.50 | 11 |
| 2019-01-13 | Perforation | 4355.00 | 4355.50 | 11 |
| 2019-01-13 | Perforation | 4340.00 | 4340.50 | 11 |
| 2019-01-13 | Perforation | 4325.00 | 4325.50 | 11 |
| 2019-01-13 | Multi-Stage Fracture | 4325.00 | 4370.50 | 0 |
| 2019-01-13 | Perforation | 4310.00 | 4310.50 | 11 |
| 2019-01-11 | Perforation | 4940.00 | 4940.50 | 11 |
| 2019-01-13 | Perforation | 4295.00 | 4295.50 | 11 |
| 2019-01-13 | Perforation | 4280.00 | 4280.50 | 11 |
| 2019-01-13 | Perforation | 4265.00 | 4265.50 | 11 |
| 2019-01-13 | Multi-Stage Fracture | 4265.00 | 4310.50 | 0 |
| 2019-01-14 | Perforation | 4250.00 | 4250.50 | 11 |
| 2019-01-14 | Perforation | 4235.00 | 4235.50 | 11 |
| 2019-01-14 | Perforation | 4220.00 | 4220.50 | 11 |
| 2019-01-14 | Perforation | 4205.00 | 4205.50 | 11 |
| 2019-01-14 | Multi-Stage Fracture | 4205.00 | 4250.50 | 0 |
| 2019-01-14 | Perforation | 4190.00 | 4190.50 | 11 |
| 2019-01-11 | Perforation | 4925.00 | 4925.50 | 11 |
| 2019-01-14 | Perforation | 4175.00 | 4175.50 | 11 |
| 2019-01-14 | Perforation | 4160.00 | 4160.50 | 11 |
| 2019-01-14 | Perforation | 4145.00 | 4145.50 | 11 |
| 2019-01-14 | Multi-Stage Fracture | 4145.00 | 4190.50 | 0 |
| 2019-01-14 | Perforation | 4130.00 | 4130.50 | 11 |
| 2019-01-14 | Perforation | 4115.00 | 4115.50 | 11 |
| 2019-01-14 | Perforation | 4100.00 | 4100.50 | 11 |
| 2019-01-14 | Perforation | 4085.00 | 4085.50 | 11 |
| 2019-01-14 | Multi-Stage Fracture | 4085.00 | 4130.50 | 0 |
| 2019-01-14 | Perforation | 4070.00 | 4070.50 | 11 |
| 2019-01-11 | Multi-Stage Fracture | 4925.00 | 4972.50 | 0 |
| 2019-01-14 | Perforation | 4055.00 | 4055.50 | 11 |
| 2019-01-14 | Perforation | 4040.00 | 4040.50 | 11 |
| 2019-01-14 | Perforation | 4025.00 | 4025.50 | 11 |
| 2019-01-14 | Multi-Stage Fracture | 4025.00 | 4070.50 | 0 |
| 2019-01-15 | Perforation | 4010.00 | 4010.50 | 11 |
| 2019-01-15 | Perforation | 3995.00 | 3995.50 | 11 |
| 2019-01-15 | Perforation | 3980.00 | 3980.50 | 11 |
| 2019-01-15 | Perforation | 3965.00 | 3965.50 | 11 |
| 2019-01-15 | Multi-Stage Fracture | 3965.00 | 4010.50 | 0 |
| 2019-01-15 | Perforation | 3950.00 | 3950.50 | 11 |
| 2019-01-11 | Perforation | 4910.00 | 4910.50 | 11 |
| 2019-01-15 | Perforation | 3935.00 | 3935.50 | 11 |
| 2019-01-15 | Perforation | 3920.00 | 3920.50 | 11 |
| 2019-01-15 | Perforation | 3905.00 | 3905.50 | 11 |
| 2019-01-15 | Multi-Stage Fracture | 3905.00 | 3950.50 | 0 |
| 2019-01-15 | Perforation | 3890.00 | 3890.50 | 11 |
| 2019-01-15 | Perforation | 3875.00 | 3875.50 | 11 |
| 2019-01-15 | Perforation | 3860.00 | 3860.50 | 11 |
| 2019-01-15 | Perforation | 3845.00 | 3845.50 | 11 |
| 2019-01-15 | Multi-Stage Fracture | 3845.00 | 3890.50 | 0 |
| 2019-01-15 | Perforation | 3830.00 | 3830.50 | 11 |
For data sources see[5]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2019-01-10 | 2019-01-19 | 2,268 | 40,403 | N/A |
| 2 | 2019-01-19 | 2019-01-19 | 2,268 | 0 | N/A |
| 3 | 2019-01-10 | 2019-01-18 | 2,268 | 0 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | hydrochloric acid | 7647-01-0 | 100 | 0.4479 | N/A | |||
| water | Not Available | 100 | 52.6842 | N/A | ||||
| Sand - Tier 2 (30/50) | Trican | silica crystalline | 14808-60-7 | 100 | 5.5022 | N/A | ||
| Sand - Tier 2 (40/70) | Trican | silica crystalline | 14808-60-7 | 100 | 3.3948 | N/A | ||
| Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 0.4244 | N/A | ||
| AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0106 | N/A | |
| dibromoacetonitrile | 3252-43-5 | 100 | 0.0106 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0106 | N/A | ||||
| polyethylene glycol | 25322-68-3 | 100 | 0.0106 | N/A | ||||
| sodium bromide | 7647-15-6 | 100 | 0.0106 | N/A | ||||
| WBO-2 | Trican | Breaker | sodium persulfate | 7775-27-1 | 100 | 0.0044 | N/A | |
| AI-11 | Trican | Corrosion Inhibitor | non-hazardous ingredients | Not Available | 100 | 0.0031 | N/A | |
| potassium iodide | 7681-11-0 | 100 | 0.0031 | N/A | ||||
| propargyl alcohol | 107-19-7 | 100 | 0.0031 | N/A | ||||
| propargyl alcohol derivative | 9393 | 100 | 0.0031 | N/A | ||||
| Bulk WXB-17 | Trican | Crosslinker | monoethanolamine | 141-43-5 | 100 | 0.1021 | N/A | |
| monoethanolamine borate | 26038-87-9 | 100 | 0.1021 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.1021 | N/A | ||||
| DF-2W | Trican | Defoamer | non-hazardous ingredients | Not Available | 100 | 0.0031 | N/A | |
| propylene glycol | 57-55-6 | 100 | 0.0031 | N/A | ||||
| Bulk FR-24 | Trican | Friction Reducer | distillates (petroleum). hydrotreated light naphthenic | 64742-53-6 | 100 | 0.0331 | N/A | |
| non-hazardous ingredients | Not Available | 100 | 0.0331 | N/A | ||||
| Bulk SI-18 | Trican | Scale Inhibitor | non-hazardous ingredients | Not Available | 100 | 0.0263 | N/A | |
| Bulk S-17X | Trican | Surfactant | 1-hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0876 | N/A | |
| benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol | 26836-07-7 | 100 | 0.0876 | N/A | ||||
| methanol | 67-56-1 | 100 | 0.0876 | N/A | ||||
| methyloxirane polymer with oxirane | 11/6/9003 | 100 | 0.0876 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0876 | N/A | ||||
| 2 | WG-111d | Trican | Gelling Agent | guar gum | 9000-30-0 | 100 | 0.0597 | N/A |
| 3 | WG-111DA | Trican | Gelling Agent | fumaric acid | 110-17-8 | 100 | 0.0841 | N/A |
| guar gum | 9000-30-0 | 100 | 0.0841 | N/A |
For data sources see[6]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2019-01-07 | 2019-01-20 | Waste Water - Municipal | 41322 |
| 2019-01-03 | 2019-01-23 | Municipal Water | 240 |
For data sources see[7]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2019 | 6661 | 0.0 | 0.0 | 0.0 |
| 2020 | 1933 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2018-11-23 | No Incident Encountered | 0.00 | 0.00 |
| 2019-01-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]