If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0304250103000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.53324,"lon":-113.39657,"icon":""}]} |
| Location: 00/03-01-030-25W4/0 | |
| Location Alias: 00/03-01-30-25 W4M | |
| Location Alias 2: 00/03-01-030-25 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 030 | |
| Meridian: 4 | |
| Range: 25 | |
| Section: 01 | |
| County/Municipality: Kneehill County | |
| Well Name: EMBER TWINING 3-1-30-25 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0425712 | |
| License Date: 2010-11-10 | |
| License Status: Issued | |
| Spud Date: 2010-12-10 | |
| Final Drill Date: 2010-12-12 | |
| Well Total Depth: 872.00 m | |
| Surface Hole Latitude: 51.533240 | |
| Surface Hole Longitude: -113.396570 |
| Date | Event |
|---|---|
| 2010-11-10 | Obtained License |
| 2010-12-10 | Surface Casing Operation Performed |
| 2010-12-12 | Finished Drilling |
| 2010-12-12 | Well Mode changed to Drilled and Cased |
| 2010-12-13 | Production Casing Operation Performed |
| 2010-12-13 | Rig Released |
| 2010-12-22 | Well Log Performed |
| 2011-02-04 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-10 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-22 | Perforation Treatment Performed - Fractured |
| 2011-02-25 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-02-25 | Well Mode changed to Testing |
| 2011-03-04 | Well Began Production |
| 2011-03-04 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-03-04 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-02-04 | Perforation | 843.00 | 844.00 | 13 |
| 2011-02-10 | Perforation | 256.60 | 257.60 | 13 |
| 2011-02-10 | Perforation | 271.00 | 272.00 | 13 |
| 2011-02-10 | Perforation | 436.00 | 437.00 | 13 |
| 2011-02-10 | Perforation | 253.20 | 254.20 | 13 |
| 2011-02-10 | Perforation | 309.70 | 310.70 | 13 |
| 2011-02-10 | Perforation | 318.50 | 319.50 | 13 |
| 2011-02-10 | Perforation | 274.00 | 275.00 | 13 |
| 2011-02-10 | Perforation | 283.10 | 284.10 | 13 |
| 2011-02-10 | Perforation | 508.30 | 509.30 | 13 |
| 2011-02-10 | Perforation | 498.60 | 500.60 | 13 |
| 2011-02-10 | Perforation | 369.50 | 370.50 | 13 |
| 2011-02-10 | Perforation | 487.10 | 489.10 | 13 |
| 2011-02-10 | Perforation | 515.60 | 517.10 | 13 |
| 2011-02-10 | Perforation | 786.00 | 787.00 | 13 |
| 2011-02-10 | Perforation | 552.20 | 552.70 | 13 |
| 2011-02-10 | Perforation | 522.80 | 523.30 | 13 |
| 2011-02-10 | Perforation | 470.50 | 471.50 | 13 |
| 2011-02-10 | Perforation | 423.20 | 425.20 | 13 |
| 2011-02-10 | Perforation | 419.40 | 421.90 | 13 |
| 2011-02-10 | Perforation | 398.00 | 399.00 | 13 |
| 2011-02-10 | Perforation | 431.60 | 432.10 | 13 |
| 2011-02-10 | Perforation | 370.90 | 371.90 | 13 |
| 2011-02-10 | Perforation | 444.50 | 446.00 | 13 |
| 2011-02-10 | Perforation | 468.40 | 469.40 | 13 |
| 2011-02-10 | Perforation | 440.00 | 442.00 | 13 |
| 2011-02-22 | Fracture | 436.00 | 437.00 | 0 |
| 2011-02-22 | Fracture | 552.20 | 552.70 | 0 |
| 2011-02-22 | Fracture | 253.20 | 523.30 | 0 |
| 2011-02-10 | Perforation | 340.40 | 341.40 | 13 |
| 2011-02-10 | Perforation | 364.90 | 366.40 | 13 |
| 2011-02-10 | Perforation | 389.50 | 391.00 | 13 |
| 2011-02-10 | Perforation | 392.00 | 393.50 | 13 |
| 2011-02-10 | Perforation | 373.20 | 374.20 | 13 |
| 2011-02-10 | Perforation | 384.90 | 385.90 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 7283 | 0.0 | 0.0 | 0.0 |
| 2012 | 8668 | 0.0 | 0.0 | 0.0 |
| 2013 | 8751 | 0.0 | 0.0 | 0.0 |
| 2014 | 8734 | 0.0 | 0.0 | 0.0 |
| 2015 | 8735 | 0.0 | 0.0 | 0.0 |
| 2016 | 8757 | 0.0 | 0.0 | 0.0 |
| 2017 | 8721 | 0.0 | 0.0 | 0.0 |
| 2018 | 8710 | 0.0 | 0.0 | 0.0 |
| 2019 | 8703 | 0.0 | 0.0 | 0.0 |
| 2020 | 2180 | 0.0 | 0.0 | 0.0 |
For data sources see[5]