X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304252608000

Well Details

Well ID: 0304252608000
Loading map...
Location: 00/08-26-030-25W4/0
Location Alias: 00/08-26-30-25 W4M
Location Alias 2: 00/08-26-030-25 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 25
Section: 26
County/Municipality: Kneehill County
Well Name: EMBER TWINING 8-26-30-25
Operator Name: Ember Resources Inc.
License Number: 0422227
License Date: 2010-07-28
License Status: Issued
Spud Date: 2010-10-05
Final Drill Date: 2010-10-07
Well Total Depth: 982.00 m
Surface Hole Latitude: 51.595247
Surface Hole Longitude: -113.405766

For data sources see[1][2]

Well History

Date Event
2010-07-28 Obtained License
2010-10-06 Surface Casing Operation Performed
2010-10-07 Finished Drilling
2010-10-07 Production Casing Operation Performed
2010-10-07 Rig Released
2010-10-07 Well Mode changed to Drilled and Cased
2010-10-15 Well Log Performed
2010-11-01 Perforation Treatment Performed - Jet Perforation
2010-11-03 Perforation Treatment Performed - Fractured
2010-11-06 Well Fluid changed to Coalbed Methane-Coals Only
2010-11-06 Well Mode changed to Testing
2010-12-19 Well Began Production
2010-12-19 Well Fluid changed to Coalbed Methane-Coals Only
2010-12-19 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-11-01 Perforation 444.50 445.00 13
2010-11-01 Perforation 313.50 314.00 13
2010-11-01 Perforation 317.10 317.60 13
2010-11-01 Perforation 215.80 216.30 13
2010-11-01 Perforation 221.40 221.90 13
2010-11-01 Perforation 319.80 320.30 13
2010-11-01 Perforation 350.10 350.60 13
2010-11-01 Perforation 380.20 380.70 13
2010-11-01 Perforation 329.80 330.30 13
2010-11-01 Perforation 334.80 335.30 13
2010-11-01 Perforation 589.30 590.30 13
2010-11-01 Perforation 444.90 446.90 13
2010-11-01 Perforation 591.60 592.10 13
2010-11-01 Perforation 583.00 583.50 13
2010-11-01 Perforation 584.30 585.30 13
2010-11-01 Perforation 605.30 605.80 13
2010-11-01 Perforation 609.50 610.00 13
2010-11-01 Perforation 602.60 603.10 13
2010-11-01 Perforation 604.00 604.50 13
2010-11-01 Perforation 571.80 572.80 13
2010-11-01 Perforation 538.20 539.20 13
2010-11-01 Perforation 500.80 501.80 13
2010-11-01 Perforation 439.20 439.70 13
2010-11-01 Perforation 506.10 506.60 13
2010-11-01 Perforation 507.20 508.70 13
2010-11-01 Perforation 554.10 555.10 13
2010-11-01 Perforation 566.60 568.10 13
2010-11-01 Perforation 541.30 541.80 13
2010-11-01 Perforation 549.30 549.80 13
2010-11-03 Fracture 215.80 592.10 0
2010-11-03 Fracture 602.60 610.00 0
2010-11-01 Perforation 440.70 441.20 13
2010-11-01 Perforation 453.50 454.00 13
2010-11-01 Perforation 492.40 492.90 13
2010-11-01 Perforation 495.40 495.90 13
2010-11-01 Perforation 460.70 461.20 13
2010-11-01 Perforation 489.20 490.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 331 0.0 0.0 0.0
2011 8726 0.0 0.0 0.0
2012 8668 0.0 0.0 0.0
2013 8751 0.0 0.0 0.0
2014 8734 0.0 0.0 0.0
2015 8744 0.0 0.0 0.0
2016 8757 0.0 0.0 0.0
2017 8721 0.0 0.0 0.0
2018 8710 0.0 0.0 0.0
2019 8704 0.0 0.0 0.0
2020 2180 0.0 0.0 0.0

For data sources see[5]

References