If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0304252808020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.596478,"lon":-113.45494,"icon":""}]} |
| Location: 02/08-28-030-25W4/0 | |
| Location Alias: 02/08-28-30-25 W4M | |
| Location Alias 2: 02/08-28-030-25 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 030 | |
| Meridian: 4 | |
| Range: 25 | |
| Section: 28 | |
| County/Municipality: Kneehill County | |
| Well Name: EMBER 102 TWINING 8-28-30-25 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0422836 | |
| License Date: 2010-08-20 | |
| License Status: Issued | |
| Spud Date: 2010-11-30 | |
| Final Drill Date: 2010-12-01 | |
| Well Total Depth: 956.00 m | |
| Surface Hole Latitude: 51.596478 | |
| Surface Hole Longitude: -113.454940 |
| Date | Event |
|---|---|
| 2010-08-20 | Obtained License |
| 2010-11-30 | Surface Casing Operation Performed |
| 2010-12-01 | Finished Drilling |
| 2010-12-01 | Well Mode changed to Drilled and Cased |
| 2010-12-02 | Production Casing Operation Performed |
| 2010-12-02 | Rig Released |
| 2010-12-05 | Well Log Performed |
| 2011-01-04 | Perforation Treatment Performed - Jet Perforation |
| 2011-01-07 | Perforation Treatment Performed - Fractured |
| 2011-01-12 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-01-12 | Well Mode changed to Testing |
| 2011-02-08 | Well Began Production |
| 2011-02-08 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-02-08 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-01-04 | Perforation | 519.10 | 521.60 | 13 |
| 2011-01-04 | Perforation | 453.50 | 455.00 | 13 |
| 2011-01-04 | Perforation | 451.40 | 451.90 | 13 |
| 2011-01-04 | Perforation | 460.60 | 461.10 | 13 |
| 2011-01-04 | Perforation | 496.10 | 496.60 | 13 |
| 2011-01-04 | Perforation | 468.40 | 468.90 | 13 |
| 2011-01-04 | Perforation | 465.10 | 465.60 | 13 |
| 2011-01-04 | Perforation | 608.50 | 609.00 | 13 |
| 2011-01-04 | Perforation | 615.00 | 616.00 | 13 |
| 2011-01-04 | Perforation | 481.00 | 485.00 | 13 |
| 2011-01-04 | Perforation | 609.50 | 610.00 | 13 |
| 2011-01-04 | Perforation | 508.90 | 509.40 | 13 |
| 2011-01-04 | Perforation | 670.00 | 672.50 | 13 |
| 2011-01-04 | Perforation | 618.20 | 619.20 | 13 |
| 2011-01-04 | Perforation | 612.20 | 613.20 | 13 |
| 2011-01-04 | Perforation | 593.10 | 593.60 | 13 |
| 2011-01-04 | Perforation | 595.00 | 595.50 | 13 |
| 2011-01-04 | Perforation | 579.20 | 580.20 | 13 |
| 2011-01-04 | Perforation | 589.50 | 590.50 | 13 |
| 2011-01-04 | Perforation | 385.00 | 386.00 | 13 |
| 2011-01-04 | Perforation | 598.00 | 599.00 | 13 |
| 2011-01-07 | Fracture | 451.40 | 599.00 | 0 |
| 2011-01-04 | Perforation | 502.00 | 502.50 | 13 |
| 2011-01-07 | Fracture | 608.50 | 619.20 | 0 |
| 2011-01-07 | Fracture | 385.00 | 616.00 | 0 |
| 2011-01-04 | Perforation | 543.60 | 545.10 | 13 |
| 2011-01-04 | Perforation | 574.70 | 575.70 | 13 |
| 2011-01-04 | Perforation | 561.30 | 562.30 | 13 |
| 2011-01-04 | Perforation | 546.50 | 547.00 | 13 |
| 2011-01-04 | Perforation | 499.70 | 500.20 | 13 |
| 2011-01-04 | Perforation | 455.50 | 457.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 7858 | 0.0 | 0.0 | 0.0 |
| 2012 | 8668 | 0.0 | 0.0 | 0.0 |
| 2013 | 8751 | 0.0 | 0.0 | 0.0 |
| 2014 | 8734 | 0.0 | 0.0 | 0.0 |
| 2015 | 8749 | 0.0 | 0.0 | 0.0 |
| 2016 | 8782 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8735 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]