If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0304253516000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.617624,"lon":-113.407347,"icon":""}]} |
| Location: 00/16-35-030-25W4/0 | |
| Location Alias: 00/16-35-30-25 W4M | |
| Location Alias 2: 00/16-35-030-25 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 030 | |
| Meridian: 4 | |
| Range: 25 | |
| Section: 35 | |
| County/Municipality: Kneehill County | |
| Well Name: EMBER TWINING 16-35-30-25 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0356041 | |
| License Date: 2006-04-25 | |
| License Status: Issued | |
| Spud Date: 2006-06-02 | |
| Final Drill Date: 2006-06-06 | |
| Well Total Depth: 877.00 m | |
| Surface Hole Latitude: 51.617624 | |
| Surface Hole Longitude: -113.407347 |
| Date | Event |
|---|---|
| 2006-04-25 | Obtained License |
| 2006-06-02 | Surface Casing Operation Performed |
| 2006-06-06 | Finished Drilling |
| 2006-06-06 | Production Casing Operation Performed |
| 2006-06-06 | Rig Released |
| 2006-06-06 | Well Mode changed to Drilled and Cased |
| 2006-06-13 | Well Log Performed |
| 2006-06-28 | Perforation Treatment Performed - Bridge Plug No Cement Required |
| 2006-07-01 | Perforation Treatment Performed - Jet Perforation |
| 2006-07-06 | Perforation Treatment Performed - Fractured |
| 2009-01-12 | Well Began Production |
| 2009-01-12 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2009-01-12 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2006-06-28 | Bridge Plug, No Cement | 652.00 | 660.00 | 0 |
| 2006-07-01 | Perforation | 494.50 | 495.50 | 13 |
| 2006-07-01 | Perforation | 498.00 | 498.50 | 13 |
| 2006-07-01 | Perforation | 535.00 | 535.50 | 13 |
| 2006-07-01 | Perforation | 539.20 | 539.70 | 13 |
| 2006-07-01 | Perforation | 544.50 | 545.00 | 13 |
| 2006-07-01 | Perforation | 551.00 | 552.00 | 13 |
| 2006-07-01 | Perforation | 581.40 | 581.90 | 13 |
| 2006-07-01 | Perforation | 583.00 | 583.50 | 13 |
| 2006-07-01 | Perforation | 597.00 | 598.50 | 13 |
| 2006-07-01 | Perforation | 599.60 | 600.10 | 13 |
| 2006-07-01 | Perforation | 359.20 | 359.70 | 13 |
| 2006-07-01 | Perforation | 609.50 | 610.50 | 13 |
| 2006-07-01 | Perforation | 614.50 | 615.50 | 13 |
| 2006-07-01 | Perforation | 625.70 | 626.20 | 13 |
| 2006-07-01 | Perforation | 630.50 | 631.00 | 13 |
| 2006-07-01 | Perforation | 644.50 | 645.00 | 13 |
| 2006-07-06 | Fracture | 644.50 | 645.00 | 0 |
| 2006-07-06 | Fracture | 625.70 | 631.00 | 0 |
| 2006-07-06 | Fracture | 614.50 | 615.50 | 0 |
| 2006-07-06 | Fracture | 609.50 | 610.50 | 0 |
| 2006-07-06 | Fracture | 597.00 | 600.10 | 0 |
| 2006-07-01 | Perforation | 379.80 | 380.30 | 13 |
| 2006-07-06 | Fracture | 581.40 | 583.50 | 0 |
| 2006-07-06 | Fracture | 551.00 | 552.00 | 0 |
| 2006-07-06 | Fracture | 544.50 | 545.00 | 0 |
| 2006-07-06 | Fracture | 535.00 | 539.70 | 0 |
| 2006-07-06 | Fracture | 494.50 | 498.50 | 0 |
| 2006-07-06 | Fracture | 483.50 | 488.50 | 0 |
| 2006-07-06 | Fracture | 475.00 | 479.00 | 0 |
| 2006-07-06 | Fracture | 428.10 | 428.60 | 0 |
| 2006-07-06 | Fracture | 420.90 | 421.40 | 0 |
| 2006-07-06 | Fracture | 407.50 | 409.50 | 0 |
| 2006-07-01 | Perforation | 407.50 | 409.50 | 13 |
| 2006-07-06 | Fracture | 379.80 | 380.30 | 0 |
| 2006-07-06 | Fracture | 359.20 | 359.70 | 0 |
| 2006-07-01 | Perforation | 420.90 | 421.40 | 13 |
| 2006-07-01 | Perforation | 428.10 | 428.60 | 13 |
| 2006-07-01 | Perforation | 475.00 | 479.00 | 13 |
| 2006-07-01 | Perforation | 483.40 | 484.90 | 13 |
| 2006-07-01 | Perforation | 488.00 | 488.50 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2009 | 8495 | 0.0 | 0.0 | 0.0 |
| 2010 | 8759 | 0.0 | 0.0 | 0.0 |
| 2011 | 8718 | 0.0 | 0.0 | 0.0 |
| 2012 | 8618 | 0.0 | 0.0 | 0.0 |
| 2013 | 8700 | 0.0 | 0.0 | 0.0 |
| 2014 | 8514 | 0.0 | 0.0 | 0.0 |
| 2015 | 8598 | 0.0 | 0.0 | 0.0 |
| 2016 | 8715 | 0.0 | 0.0 | 0.0 |
| 2017 | 8682 | 0.0 | 0.0 | 0.0 |
| 2018 | 8603 | 0.0 | 0.0 | 0.0 |
| 2019 | 8704 | 0.0 | 0.0 | 0.0 |
| 2020 | 2160 | 0.0 | 0.0 | 0.0 |
For data sources see[5]