If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0304262512000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.599877,"lon":-113.539769,"icon":""}]} |
| Location: 00/12-25-030-26W4/0 | |
| Location Alias: 00/12-25-30-26 W4M | |
| Location Alias 2: 00/12-25-030-26 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 030 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 25 | |
| County/Municipality: Kneehill County | |
| Well Name: EMBER TWINING 12-25-30-26 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0423425 | |
| License Date: 2010-09-10 | |
| License Status: Issued | |
| Spud Date: 2010-11-08 | |
| Final Drill Date: 2010-11-17 | |
| Well Total Depth: 970.00 m | |
| Surface Hole Latitude: 51.599877 | |
| Surface Hole Longitude: -113.539769 |
| Date | Event |
|---|---|
| 2010-09-10 | Obtained License |
| 2010-11-08 | Surface Casing Operation Performed |
| 2010-11-17 | Finished Drilling |
| 2010-11-17 | Production Casing Operation Performed |
| 2010-11-17 | Rig Released |
| 2010-11-17 | Well Mode changed to Drilled and Cased |
| 2010-11-29 | Well Log Performed |
| 2010-12-30 | Perforation Treatment Performed - Jet Perforation |
| 2011-01-06 | Perforation Treatment Performed - Fractured |
| 2011-01-11 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-01-11 | Well Mode changed to Testing |
| 2011-01-21 | Well Began Production |
| 2011-01-21 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-01-21 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-12-30 | Perforation | 461.20 | 461.70 | 13 |
| 2010-12-30 | Perforation | 401.50 | 405.00 | 13 |
| 2010-12-30 | Perforation | 389.50 | 391.50 | 13 |
| 2010-12-30 | Perforation | 396.20 | 396.70 | 13 |
| 2010-12-30 | Perforation | 342.80 | 343.30 | 13 |
| 2010-12-30 | Perforation | 351.60 | 352.10 | 13 |
| 2010-12-30 | Perforation | 452.50 | 456.00 | 13 |
| 2010-12-30 | Perforation | 333.50 | 334.00 | 13 |
| 2010-12-30 | Perforation | 482.00 | 482.50 | 13 |
| 2010-12-30 | Perforation | 617.70 | 618.20 | 13 |
| 2010-12-30 | Perforation | 614.90 | 615.40 | 13 |
| 2010-12-30 | Perforation | 464.30 | 464.80 | 13 |
| 2010-12-30 | Perforation | 611.80 | 612.30 | 13 |
| 2010-12-30 | Perforation | 618.70 | 619.70 | 13 |
| 2010-12-30 | Perforation | 640.30 | 641.30 | 13 |
| 2010-12-30 | Perforation | 631.70 | 632.20 | 13 |
| 2010-12-30 | Perforation | 628.60 | 630.10 | 13 |
| 2010-12-30 | Perforation | 610.30 | 610.80 | 13 |
| 2010-12-30 | Perforation | 518.10 | 519.10 | 13 |
| 2010-12-30 | Perforation | 538.70 | 539.70 | 13 |
| 2010-12-30 | Perforation | 514.10 | 514.60 | 13 |
| 2010-12-30 | Perforation | 517.00 | 517.50 | 13 |
| 2010-12-30 | Perforation | 357.80 | 358.30 | 13 |
| 2010-12-30 | Perforation | 581.30 | 583.30 | 13 |
| 2010-12-30 | Perforation | 599.00 | 602.50 | 13 |
| 2010-12-30 | Perforation | 567.00 | 568.00 | 13 |
| 2011-01-06 | Fracture | 452.50 | 456.00 | 0 |
| 2011-01-06 | Fracture | 389.50 | 399.00 | 0 |
| 2011-01-06 | Fracture | 461.20 | 612.30 | 0 |
| 2011-01-06 | Fracture | 628.60 | 641.30 | 0 |
| 2011-01-06 | Fracture | 333.50 | 358.30 | 0 |
| 2010-12-30 | Perforation | 406.80 | 407.30 | 13 |
| 2010-12-30 | Perforation | 475.90 | 476.40 | 13 |
| 2010-12-30 | Perforation | 479.90 | 480.40 | 13 |
| 2010-12-30 | Perforation | 468.10 | 469.10 | 13 |
| 2010-12-30 | Perforation | 474.40 | 474.90 | 13 |
| 2010-12-30 | Perforation | 398.00 | 399.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 8290 | 0.0 | 0.0 | 0.0 |
| 2012 | 8668 | 0.0 | 0.0 | 0.0 |
| 2013 | 8751 | 0.0 | 0.0 | 0.0 |
| 2014 | 8734 | 0.0 | 0.0 | 0.0 |
| 2015 | 8749 | 0.0 | 0.0 | 0.0 |
| 2016 | 8782 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]