If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0304262616000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.604323,"lon":-113.549732,"icon":""}]} |
| Location: 00/16-26-030-26W4/0 | |
| Location Alias: 00/16-26-30-26 W4M | |
| Location Alias 2: 00/16-26-030-26 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 030 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 26 | |
| County/Municipality: Kneehill County | |
| Well Name: EMBER TWINING 16-26-30-26 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0423767 | |
| License Date: 2010-09-23 | |
| License Status: Amended | |
| Spud Date: 2010-11-18 | |
| Final Drill Date: 2010-11-20 | |
| Well Total Depth: 983.50 m | |
| Surface Hole Latitude: 51.604323 | |
| Surface Hole Longitude: -113.549732 |
| Date | Event |
|---|---|
| 2010-09-23 | Obtained License |
| 2010-11-18 | Surface Casing Operation Performed |
| 2010-11-20 | Direction Drilling Operation Performed - Deviate |
| 2010-11-20 | Finished Drilling |
| 2010-11-20 | Well Mode changed to Drilled and Cased |
| 2010-11-21 | Production Casing Operation Performed |
| 2010-11-21 | Rig Released |
| 2010-11-29 | Well Log Performed |
| 2010-12-29 | Perforation Treatment Performed - Jet Perforation |
| 2011-01-05 | Perforation Treatment Performed - Fractured |
| 2011-01-08 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-01-08 | Well Mode changed to Testing |
| 2011-01-18 | Well Began Production |
| 2011-01-18 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-01-18 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2010-11-20 | 338.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-12-29 | Perforation | 527.80 | 529.30 | 13 |
| 2010-12-29 | Perforation | 239.00 | 242.00 | 13 |
| 2010-12-29 | Perforation | 419.00 | 419.50 | 13 |
| 2010-12-29 | Perforation | 367.30 | 368.30 | 13 |
| 2010-12-29 | Perforation | 352.50 | 353.00 | 13 |
| 2010-12-29 | Perforation | 638.70 | 640.20 | 13 |
| 2010-12-29 | Perforation | 628.90 | 629.90 | 13 |
| 2010-12-29 | Perforation | 626.40 | 627.40 | 13 |
| 2010-12-29 | Perforation | 782.00 | 782.50 | 13 |
| 2010-12-29 | Perforation | 649.30 | 650.30 | 13 |
| 2010-12-29 | Perforation | 641.90 | 642.40 | 13 |
| 2010-12-29 | Perforation | 526.90 | 527.40 | 13 |
| 2010-12-29 | Perforation | 592.80 | 593.30 | 13 |
| 2010-12-29 | Perforation | 591.50 | 592.00 | 13 |
| 2010-12-29 | Perforation | 580.30 | 580.80 | 13 |
| 2010-12-29 | Perforation | 610.10 | 613.10 | 13 |
| 2010-12-29 | Perforation | 625.10 | 625.60 | 13 |
| 2010-12-29 | Perforation | 618.70 | 619.20 | 13 |
| 2011-01-05 | Fracture | 239.00 | 242.00 | 0 |
| 2011-01-05 | Fracture | 341.80 | 613.10 | 0 |
| 2011-01-05 | Fracture | 638.70 | 650.30 | 0 |
| 2011-01-05 | Fracture | 625.10 | 629.90 | 0 |
| 2010-12-29 | Perforation | 485.20 | 486.20 | 13 |
| 2010-12-29 | Perforation | 578.20 | 579.20 | 13 |
| 2010-12-29 | Perforation | 551.50 | 552.00 | 13 |
| 2010-12-29 | Perforation | 550.30 | 550.80 | 13 |
| 2010-12-29 | Perforation | 471.90 | 472.90 | 13 |
| 2010-12-29 | Perforation | 347.20 | 347.70 | 13 |
| 2010-12-29 | Perforation | 341.80 | 342.30 | 13 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 8390 | 0.0 | 0.0 | 0.0 |
| 2012 | 8668 | 0.0 | 0.0 | 0.0 |
| 2013 | 8751 | 0.0 | 0.0 | 0.0 |
| 2014 | 8734 | 0.0 | 0.0 | 0.0 |
| 2015 | 8749 | 0.0 | 0.0 | 0.0 |
| 2016 | 8782 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]