If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0304263613000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.617823,"lon":-113.535021,"icon":""}]} |
| Location: 00/13-36-030-26W4/0 | |
| Location Alias: 00/13-36-30-26 W4M | |
| Location Alias 2: 00/13-36-030-26 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 030 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 36 | |
| County/Municipality: Kneehill County | |
| Well Name: EMBER TWINING 13-36-30-26 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0423571 | |
| License Date: 2010-09-16 | |
| License Status: Issued | |
| Spud Date: 2010-10-24 | |
| Final Drill Date: 2010-10-28 | |
| Well Total Depth: 1060.00 m | |
| Surface Hole Latitude: 51.617823 | |
| Surface Hole Longitude: -113.535021 |
| Date | Event |
|---|---|
| 2010-09-16 | Obtained License |
| 2010-10-24 | Direction Drilling Operation Performed - Deviate |
| 2010-10-25 | Surface Casing Operation Performed |
| 2010-10-28 | Finished Drilling |
| 2010-10-28 | Well Mode changed to Drilled and Cased |
| 2010-10-29 | Production Casing Operation Performed |
| 2010-10-29 | Rig Released |
| 2010-11-02 | Well Log Performed |
| 2010-11-18 | Perforation Treatment Performed - Jet Perforation |
| 2010-11-19 | Perforation Treatment Performed - Jet Perforation |
| 2010-11-29 | Perforation Treatment Performed - Fractured |
| 2010-12-02 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2010-12-02 | Well Mode changed to Testing |
| 2011-01-05 | Well Began Production |
| 2011-01-05 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-01-05 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2010-10-24 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-11-18 | Perforation | 697.90 | 698.40 | 13 |
| 2010-11-19 | Perforation | 502.60 | 503.10 | 13 |
| 2010-11-19 | Perforation | 557.00 | 558.00 | 13 |
| 2010-11-19 | Perforation | 555.00 | 556.50 | 13 |
| 2010-11-19 | Perforation | 476.10 | 476.60 | 13 |
| 2010-11-19 | Perforation | 538.00 | 540.00 | 13 |
| 2010-11-19 | Perforation | 463.00 | 465.00 | 13 |
| 2010-11-19 | Perforation | 413.60 | 414.10 | 13 |
| 2010-11-19 | Perforation | 602.60 | 603.60 | 13 |
| 2010-11-19 | Perforation | 659.20 | 660.20 | 13 |
| 2010-11-19 | Perforation | 656.50 | 658.00 | 13 |
| 2010-11-18 | Perforation | 698.90 | 700.40 | 13 |
| 2010-11-19 | Perforation | 668.90 | 670.40 | 13 |
| 2010-11-19 | Perforation | 668.00 | 668.50 | 13 |
| 2010-11-19 | Perforation | 558.30 | 559.30 | 13 |
| 2010-11-19 | Perforation | 566.20 | 566.70 | 13 |
| 2010-11-19 | Perforation | 625.10 | 626.10 | 13 |
| 2010-11-19 | Perforation | 617.60 | 618.10 | 13 |
| 2010-11-29 | Fracture | 538.00 | 540.00 | 0 |
| 2010-11-29 | Fracture | 710.60 | 721.50 | 0 |
| 2010-11-29 | Fracture | 463.00 | 465.00 | 0 |
| 2010-11-29 | Fracture | 602.60 | 603.60 | 0 |
| 2010-11-18 | Perforation | 683.10 | 686.10 | 13 |
| 2010-11-29 | Fracture | 549.70 | 566.70 | 0 |
| 2010-11-29 | Fracture | 617.60 | 700.40 | 0 |
| 2010-11-29 | Fracture | 413.60 | 414.10 | 0 |
| 2010-11-29 | Fracture | 476.10 | 503.10 | 0 |
| 2010-11-18 | Perforation | 696.40 | 697.40 | 13 |
| 2010-11-18 | Perforation | 712.00 | 712.50 | 13 |
| 2010-11-18 | Perforation | 720.50 | 721.50 | 13 |
| 2010-11-18 | Perforation | 714.40 | 714.90 | 13 |
| 2010-11-18 | Perforation | 710.60 | 711.10 | 13 |
| 2010-11-19 | Perforation | 549.70 | 550.20 | 13 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 24 | 0.0 | 0.0 | 0.0 |
| 2011 | 8650 | 0.0 | 0.0 | 0.0 |
| 2012 | 8668 | 0.0 | 0.0 | 0.0 |
| 2013 | 8751 | 0.0 | 0.0 | 0.0 |
| 2014 | 8734 | 0.0 | 0.0 | 0.0 |
| 2015 | 8749 | 0.0 | 0.0 | 0.0 |
| 2016 | 8782 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]