X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304271007020

Well Details

Well ID: 0304271007020
Loading map...
Location: 02/07-10-030-27W4/0
Location Alias: 02/07-10-30-27 W4M
Location Alias 2: 02/07-10-030-27 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 27
Section: 10
County/Municipality: Mountain View County
Well Name: EMBER 102 LPINECK 7-10-30-27
Operator Name: Ember Resources Inc.
License Number: 0325672
License Date: 2005-02-04
License Status: Issued
Spud Date: 2005-05-20
Final Drill Date: 2005-05-23
Well Total Depth: 1138.00 m
Surface Hole Latitude: 51.553668
Surface Hole Longitude: -113.715212

For data sources see[1][2]

Well History

Date Event
2005-02-04 Obtained License
2005-05-20 Surface Casing Operation Performed
2005-05-21 Well Log Performed
2005-05-23 Finished Drilling
2005-05-23 Well Mode changed to Drilled and Cased
2005-05-24 Production Casing Operation Performed
2005-05-25 Rig Released
2005-06-23 Perforation Treatment Performed - Jet Perforation
2005-06-23 Well Log Performed
2005-09-03 Perforation Treatment Performed - Jet Perforation
2005-09-03 Well Log Performed
2005-09-04 Perforation Treatment Performed - Jet Perforation
2005-09-05 Perforation Treatment Performed - Fractured
2005-09-07 Well Log Performed
2017-03-23 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-06-23 Perforation 1067.00 1072.00 17
2005-09-03 Perforation 946.00 951.00 17
2005-09-03 Perforation 953.00 957.00 17
2005-09-03 Perforation 981.00 984.00 17
2005-09-03 Perforation 1003.00 1004.50 17
2005-09-04 Perforation 343.50 344.20 17
2005-09-04 Perforation 347.90 348.40 17
2005-09-04 Perforation 395.20 395.70 17
2005-09-04 Perforation 419.00 424.00 17
2005-09-04 Perforation 460.80 461.40 17
2005-09-04 Perforation 463.60 464.10 17
2005-09-03 Perforation 726.10 726.90 17
2005-09-04 Perforation 472.50 473.00 17
2005-09-04 Perforation 586.30 587.00 17
2005-09-04 Perforation 590.00 594.00 17
2005-09-04 Perforation 669.00 671.00 17
2005-09-04 Perforation 683.40 684.10 17
2005-09-04 Perforation 689.30 689.80 17
2005-09-04 Perforation 705.50 706.00 17
2005-09-04 Perforation 724.90 725.40 17
2005-09-05 Fracture 1067.00 1072.00 0
2005-09-05 Fracture 343.50 1004.50 0
2005-09-03 Perforation 727.50 729.60 17
2005-09-03 Perforation 740.00 740.60 17
2005-09-03 Perforation 742.90 743.90 17
2005-09-03 Perforation 750.20 750.70 17
2005-09-03 Perforation 838.00 843.00 17
2005-09-03 Perforation 879.00 884.00 17
2005-09-03 Perforation 893.00 895.00 17

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2006-07-07 No Incident Encountered 0.00 0.00

For data sources see[5]

References