X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0305010306000

Well Details

Well ID: 0305010306000
Loading map...
Location: 00/06-03-030-01W5/0
Location Alias: 00/06-03-30-01 W5M
Location Alias 2: 00/06-03-030-01 W5/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 5
Range: 01
Section: 03
County/Municipality: Mountain View County
Well Name: NAL CROSSE 6-3-30-1
Operator Name: NAL Resources Limited
License Number: 0029108
License Date: 1965-10-05
License Status: Abandoned
Spud Date: 1965-10-07
Final Drill Date: 1965-11-19
Well Total Depth: 2715.20 m
Surface Hole Latitude: 51.538452
Surface Hole Longitude: -114.063197

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-10-05 Obtained License
1965-11-19 Finished Drilling
1965-11-20 Drill Stem Test Performed
1965-11-22 Production Casing Operation Performed
1965-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-12-12 Perforation Treatment Performed - Jet Perforation
1965-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-05-28 Well Mode changed to Drilled and Cased
1966-05-29 Well Fluid changed to Gas
1966-05-29 Well Mode changed to Testing
1969-01-01 Perforation Treatment Performed - Chemical Squeeze
1969-01-18 Perforation Treatment Performed - Chemical Squeeze
1969-02-04 Perforation Treatment Performed - Jet Perforation
1969-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-01-08 Well Log Performed
2001-09-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-09-14 Plug Back Performed
2001-09-14 Well Fluid changed to Gas
2001-09-14 Well Log Performed
2001-09-14 Well Mode changed to Abandoned Zone
2001-09-17 Perforation Treatment Performed - Jet Perforation
2001-09-18 Perforation Treatment Performed - Cement Squeeze
2001-09-18 Plug Back Performed
2001-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-09-21 Perforation Treatment Performed - Jet Perforation
2001-09-22 Perforation Treatment Performed - Cement Squeeze
2001-09-25 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-12-12 Perforation 2679.20 2685.90 7
2001-09-14 Packing Device Capped w/Cement 2612.00 2620.00 0
2001-09-17 Perforation 1659.00 1660.00 13
2001-09-17 Perforation 1675.00 1676.00 13
2001-09-18 Cement Squeeze 1659.00 1676.00 0
2001-09-20 Packing Device Capped w/Cement 492.00 500.00 0
2001-09-21 Perforation 394.00 470.00 13
2001-09-22 Cement Squeeze 394.00 470.00 0
1965-12-12 Perforation 2687.10 2691.10 7
1965-12-12 Acid Treatment 2679.20 2691.10 0
1965-12-16 Acid Treatment 2679.20 2691.10 0
1969-01-01 Chemical Squeeze 2679.20 2691.10 0
1969-01-18 Chemical Squeeze 2679.20 2691.10 0
1969-02-04 Perforation 2668.50 2672.20 7
1969-02-04 Perforation 2673.10 2674.30 7
1969-02-05 Acid Treatment 2668.50 2691.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 1020 0.0 0.0 0.0
1971 76 0.0 0.0 0.0
1977 40 0.0 0.0 0.0

For data sources see[5]

References