X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0305011904000

Well Details

Well ID: 0305011904000
Loading map...
Location: 00/04-19-030-01W5/0
Location Alias: 00/04-19-30-01 W5M
Location Alias 2: 00/04-19-030-01 W5/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 5
Range: 01
Section: 19
County/Municipality: Mountain View County
Well Name: NAL CROSS 4-19-30-1
Operator Name: NAL Resources Limited
License Number: 0431525
License Date: 2011-02-14
License Status: Issued
Spud Date: 2011-02-25
Final Drill Date: 2011-03-19
Well Total Depth: 3400.00 m
Surface Hole Latitude: 51.586864
Surface Hole Longitude: -114.123940

For data sources see[1][2]

Well History

Date Event
2011-02-14 Obtained License
2011-02-25 Well Log Performed
2011-02-27 Surface Casing Operation Performed
2011-03-04 Direction Drilling Operation Performed - Horizontal
2011-03-11 Intermediate Casing Operation Performed
2011-03-19 Finished Drilling
2011-03-19 Well Mode changed to Drilled and Cased
2011-03-22 Liner Casing Operation Performed
2011-03-22 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-22 Perforation Treatment Performed - Open-Hole Completion
2011-03-22 Well Log Performed
2011-03-23 Rig Released
2011-03-27 Well Log Performed
2011-04-16 Well Began Production
2011-04-16 Well Fluid changed to Gas
2011-04-16 Well Mode changed to Flowing
2012-01-13 Well Fluid changed to Gas
2012-01-13 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-03-04 2057.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-03-22 Open Hole/Barefoot Completion 3303.60 3400.00 0
2011-03-22 Multi-Stage Fracture 3199.20 3199.30 0
2011-03-22 Multi-Stage Fracture 3303.50 3303.60 0
2011-03-22 Multi-Stage Fracture 2540.20 2540.30 0
2011-03-22 Multi-Stage Fracture 2585.20 2585.30 0
2011-03-22 Multi-Stage Fracture 2672.10 2672.20 0
2011-03-22 Multi-Stage Fracture 2759.80 2759.90 0
2011-03-22 Multi-Stage Fracture 2847.70 2847.80 0
2011-03-22 Multi-Stage Fracture 2935.80 2935.90 0
2011-03-22 Multi-Stage Fracture 3023.60 3023.70 0
2011-03-22 Multi-Stage Fracture 3111.40 3111.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 5823 0.0 0.0 0.0
2012 7991 0.0 0.0 0.0
2013 8573 0.0 0.0 0.0
2014 8395 0.0 0.0 0.0
2015 5125 0.0 0.0 0.0
2016 7082 0.0 0.0 0.0
2017 7620 0.0 0.0 0.0
2018 8422 0.0 0.0 0.0
2019 7049 0.0 0.0 0.0
2020 2138 0.0 0.0 0.0

For data sources see[6]

References