If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0305021307000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.568604,"lon":-114.149691,"icon":""}]} |
Location: 00/07-13-030-02W5/0 | |
Location Alias: 00/07-13-30-02 W5M | |
Location Alias 2: 00/07-13-030-02 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 5 | |
Range: 02 | |
Section: 13 | |
County/Municipality: Mountain View County | |
Well Name: Canlin CROSS 7-13-30-2 | |
Operator Name: Bighorn Energy Corporation | |
License Number: 0087299 | |
License Date: 1980-11-27 | |
License Status: Suspension | |
Spud Date: 1980-12-02 | |
Final Drill Date: 1980-12-30 | |
Well Total Depth: 2500.00 m | |
Surface Hole Latitude: 51.568604 | |
Surface Hole Longitude: -114.149691 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-11-27 | Obtained License |
1980-12-14 | Drill Stem Test Performed |
1980-12-23 | Drill Stem Test Performed |
1980-12-30 | Finished Drilling |
1981-01-02 | Drill Stem Test Performed |
1981-01-04 | Drill Stem Test Performed |
1981-01-05 | Drill Stem Test Performed |
1981-01-09 | Production Casing Operation Performed |
1981-01-25 | Perforation Treatment Performed - Jet Perforation |
1981-01-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-02-04 | Perforation Treatment Performed - Jet Perforation |
1981-02-06 | Perforation Treatment Performed - Jet Perforation |
1981-02-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-02-20 | Perforation Treatment Performed - Cement Squeeze |
1981-02-26 | Perforation Treatment Performed - Jet Perforation |
1981-02-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-03-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-03-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-03-09 | Perforation Treatment Performed - Jet Perforation |
1981-03-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-03-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-03-17 | Perforation Treatment Performed - Cement Squeeze |
1981-07-08 | Perforation Treatment Performed - Cement Plug |
1981-07-10 | Well Mode changed to Abandoned and Whipstocked |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-01-25 | Perforation | 2449.00 | 2462.00 | 10 |
1981-03-02 | Acid Treatment | 2421.00 | 2423.00 | 0 |
1981-03-04 | Acid Treatment | 2421.00 | 2423.00 | 0 |
1981-03-09 | Perforation | 2366.50 | 2372.50 | 10 |
1981-03-09 | Perforation | 2375.50 | 2381.00 | 10 |
1981-03-09 | Perforation | 2382.00 | 2389.00 | 10 |
1981-03-10 | Acid Treatment | 2366.50 | 2389.00 | 0 |
1981-03-14 | Acid Treatment | 2366.50 | 2389.00 | 0 |
1981-03-17 | Cement Squeeze | 2366.50 | 2384.00 | 0 |
1981-07-08 | Cement Plug | 1440.00 | 1504.00 | 0 |
1981-01-26 | Acid Treatment | 2449.00 | 2462.00 | 0 |
1981-02-04 | Perforation | 2438.00 | 2444.00 | 10 |
1981-02-06 | Perforation | 2420.50 | 2424.00 | 10 |
1981-02-06 | Perforation | 2426.50 | 2428.00 | 10 |
1981-02-11 | Acid Treatment | 2420.50 | 2428.00 | 0 |
1981-02-20 | Cement Squeeze | 2420.50 | 2428.00 | 0 |
1981-02-26 | Perforation | 2421.00 | 2423.00 | 10 |
1981-02-27 | Acid Treatment | 2421.00 | 2423.00 | 0 |
For data sources see[4]