X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0305032801000

Well Details

Well ID: 0305032801000
Loading map...
Location: 00/01-28-030-03W5/0
Location Alias: 00/01-28-30-03 W5M
Location Alias 2: 00/01-28-030-03 W5/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 5
Range: 03
Section: 28
County/Municipality: Mountain View County
Well Name: TRANSGLOBE CROSS 1-28-30-3
Operator Name: TransGlobe Energy Corporation
License Number: 0454031
License Date: 2013-01-23
License Status: Issued
Spud Date: 2013-02-12
Final Drill Date: 2013-02-28
Well Total Depth: 3540.00 m
Surface Hole Latitude: 51.606657
Surface Hole Longitude: -114.350108

For data sources see[1][2]

Well History

Date Event
2013-01-23 Obtained License
2013-02-13 Surface Casing Operation Performed
2013-02-17 Direction Drilling Operation Performed - Deviate
2013-02-18 Direction Drilling Operation Performed - Horizontal
2013-02-18 Well Log Performed
2013-02-22 Intermediate Casing Operation Performed
2013-02-28 Finished Drilling
2013-02-28 Well Log Performed
2013-02-28 Well Mode changed to Drilled and Cased
2013-03-03 Liner Casing Operation Performed
2013-03-03 Perforation Treatment Performed - Open-Hole Completion
2013-03-04 Rig Released
2013-03-05 Well Log Performed
2013-03-09 Perforation Treatment Performed - Multi-Stage Fracture
2013-03-10 Perforation Treatment Performed - Multi-Stage Fracture
2013-03-10 Well Began Production
2013-03-10 Well Fluid changed to Crude Oil
2013-03-10 Well Mode changed to Pumping
2013-03-14 Well Log Performed

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-02-12 Precision Drilling Corporation 377 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-02-17 1709.30 Deviate (5 - 79 degrees)
2013-02-18 2272.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-03-03 Open Hole/Barefoot Completion 3515.10 3540.00 0
2013-03-09 Multi-Stage Fracture 3033.00 3033.10 0
2013-03-09 Multi-Stage Fracture 2974.60 2974.70 0
2013-03-09 Multi-Stage Fracture 2916.20 2916.30 0
2013-03-09 Multi-Stage Fracture 2858.10 2858.20 0
2013-03-09 Multi-Stage Fracture 2799.80 2799.90 0
2013-03-09 Multi-Stage Fracture 2741.50 2741.60 0
2013-03-09 Multi-Stage Fracture 2669.90 2670.00 0
2013-03-09 Multi-Stage Fracture 2611.60 2611.70 0
2013-03-10 Multi-Stage Fracture 2553.30 2553.40 0
2013-03-10 Multi-Stage Fracture 2495.00 2495.10 0
2013-03-09 Multi-Stage Fracture 3514.40 3514.50 0
2013-03-10 Multi-Stage Fracture 2436.60 2436.70 0
2013-03-10 Multi-Stage Fracture 2378.20 2378.30 0
2013-03-09 Multi-Stage Fracture 3455.80 3455.90 0
2013-03-09 Multi-Stage Fracture 3397.30 3397.40 0
2013-03-09 Multi-Stage Fracture 3338.90 3339.00 0
2013-03-09 Multi-Stage Fracture 3280.20 3280.30 0
2013-03-09 Multi-Stage Fracture 3221.70 3221.80 0
2013-03-09 Multi-Stage Fracture 3163.30 3163.40 0
2013-03-09 Multi-Stage Fracture 3091.50 3091.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-03-09 2013-03-10 2,038 2,390 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 6.1661 N/A
water 7732-18-5 100 79.1367 N/A
Sand (20/40) Trican silica crystalline 14808-60-7 100 4.6065 N/A
Sand (30/50) Trican silica crystalline 14808-60-7 100 4.6794 N/A
Sand (40/70) Trican silica crystalline 14808-60-7 100 5.5388 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.013 N/A
dibromoacetonitrile 3252-43-5 100 0.013 N/A
non-hazardous ingredients Not Available 100 0.013 N/A
polyethylene glycol 25322-68-3 100 0.013 N/A
sodium bromide 7647-15-6 100 0.013 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0238 N/A
GCS-2 Trican Clay Control poly(N.N-diallyl-N.N-dimethylammonium chloride) 26062-79-3 100 0.1626 N/A
propylene glycol 57-55-6 100 0.1626 N/A
GFR-1 Trican Friction Reducer non-hazardous ingredients Not Available 100 0.1006 N/A
GSI-1 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.1316 N/A
S- 2 Trican Surfactant 2-ethylhexanol 104-76-7 100 0.1313 N/A
isopropanol 67-63-0 100 0.1313 N/A
methanol 67-56-1 100 0.1313 N/A
oxydiethylenebis(alkyldimethyl ammonium chloride) 68607-28-3 100 0.1313 N/A
solvent naphtha (petroleum). heavy aromatic 64742-94-5 100 0.1313 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-03-06 2013-03-08 Waste Water - Municipal 2142
2013-03-06 2013-03-08 Recycled Fracturing Water (treated at well site) 696

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 6421 0.0 0.0 0.0
2014 8524 0.0 0.0 0.0
2015 8048 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8663 0.0 0.0 0.0
2018 8231 0.0 0.0 0.0
2019 7541 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-04-03 No Incident Encountered 0.00 0.00

For data sources see[10]

References