X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0305100813000

Well Details

Well ID: 0305100813000
Loading map...
Location: 00/13-08-030-10W5/0
Location Alias: 00/13-08-30-10 W5M
Location Alias 2: 00/13-08-030-10 W5/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 5
Range: 10
Section: 08
County/Municipality: Municipal District of Bighorn No. 8
Well Name: Canlin PANTHER 13-8-30-10
Operator Name: Canlin Energy Corporation
License Number: 0294396
License Date: 2003-10-14
License Status: Amended
Spud Date: 2003-11-29
Final Drill Date: 2004-06-08
Well Total Depth: 6372.00 m
Surface Hole Latitude: 51.582971
Surface Hole Longitude: -115.404416

For data sources see[1][2]

Well History

Date Event
2003-10-14 Obtained License
2003-12-04 Surface Casing Operation Performed
2004-01-15 Direction Drilling Operation Performed - Deviate
2004-02-04 Well Log Performed
2004-02-06 Production Casing Operation Performed
2004-03-06 Well Log Performed
2004-04-07 Well Log Performed
2004-04-13 Liner Casing Operation Performed
2004-04-15 Well Log Performed
2004-04-19 Direction Drilling Operation Performed - Horizontal
2004-05-13 Well Log Performed
2004-06-08 Finished Drilling
2004-06-08 Well Mode changed to Drilled and Cased
2004-06-11 Well Log Performed
2004-06-19 Perforation Treatment Performed - Open-Hole Completion
2004-06-22 Rig Released
2004-07-01 Well Began Production
2004-07-01 Well Fluid changed to Gas
2004-07-01 Well Mode changed to Pumping
2004-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-04-27 Well Log Performed
2005-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2004-01-15 2515.60 Deviate (5 - 79 degrees)
2004-04-19 4525.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-06-19 Open Hole/Barefoot Completion 4462.00 6372.00 0
2004-07-16 Acid Treatment 4462.00 6372.00 0
2005-05-18 Acid Treatment 5909.00 6372.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 3290 0.0 0.0 0.0
2005 7212 0.0 0.0 0.0
2006 7138 0.0 0.0 0.0
2007 8320 0.0 0.0 0.0
2008 6873 0.0 0.0 0.0
2009 8148 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8613 0.0 0.0 0.0
2013 8735 0.0 0.0 0.0
2014 7655 0.0 0.0 0.0
2015 8016 0.0 0.0 0.0
2016 7200 0.0 0.0 0.0
2017 8706 0.0 0.0 0.0
2018 6480 0.0 0.0 0.0
2019 3600 0.0 0.0 0.0
2020 168 0.0 0.0 0.0

For data sources see[6]

References