X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0305102905003

Well Details

Well ID: 0305102905003
Loading map...
Location: 00/05-29-030-10W5/3
Location Alias: 00/05-29-30-10 W5M
Location Alias 2: 00/05-29-030-10 W5/03
Country: Canada
Province: Alberta
Township: 030
Meridian: 5
Range: 10
Section: 29
County/Municipality: Municipal District of Bighorn No. 8
Well Name: Canlin PANTHER 5-29-30-10
Operator Name: Canlin Energy Corporation
License Number: 0029329
License Date: 1965-11-05
License Status: Suspension
Spud Date: 1965-01-26
Final Drill Date: 1975-12-28
Well Total Depth: 4268.70 m
Surface Hole Latitude: 51.599631
Surface Hole Longitude: -115.385453

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-04-05 Drill Stem Test Performed
1965-07-09 Perforation Treatment Performed - Selective Jet Perforations
1965-08-22 Perforation Treatment Performed - Selective Jet Perforations
1965-08-26 Perforation Treatment Performed - Jet Perforation
1965-10-15 Perforation Treatment Performed - Jet Perforation
1965-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-11-05 Obtained License
1966-09-26 Perforation Treatment Performed - Selective Jet Perforations
1966-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-10-14 Perforation Treatment Performed - Selective Jet Perforations
1975-11-29 Well Log Performed
1975-11-30 Well Log Performed
1975-12-03 Perforation Treatment Performed - Cement Squeeze
1975-12-28 Finished Drilling
1975-12-29 Well Log Performed
1976-01-02 Liner Casing Operation Performed
1976-01-22 Perforation Treatment Performed - Jet Perforation
1976-01-26 Perforation Treatment Performed - Acid Wash - No Pressure
1976-01-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-02-08 Perforation Treatment Performed - Fractured
1976-02-10 Perforation Treatment Performed - Alcohol Squeeze
1976-02-17 Perforation Treatment Performed - Jet Perforation
1976-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-03-01 Perforation Treatment Performed - Jet Perforation
1976-03-02 Perforation Treatment Performed - Jet Perforation
1976-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-03-19 Well Mode changed to Drilled and Cased
1996-10-26 Well Log Performed
1996-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-28 Plug Back Performed
1996-10-28 Well Mode changed to Abandoned Zone
1996-10-29 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-07-09 Selective Jet Perforations 2750.80 2753.60 0
1965-10-16 Acid Treatment 2722.20 2760.90 0
1966-09-26 Selective Jet Perforations 2929.10 2929.40 0
1966-09-26 Selective Jet Perforations 2930.70 2933.70 0
1966-09-26 Selective Jet Perforations 2937.40 2938.30 0
1966-09-26 Selective Jet Perforations 2940.70 2941.30 0
1966-09-26 Selective Jet Perforations 2942.80 2944.70 0
1966-09-26 Selective Jet Perforations 2945.00 2979.40 0
1966-09-26 Selective Jet Perforations 2980.00 2981.60 0
1966-09-26 Selective Jet Perforations 2995.30 2996.50 0
1966-09-26 Selective Jet Perforations 2998.00 2998.60 0
1965-07-09 Selective Jet Perforations 2755.10 2756.60 0
1966-09-26 Selective Jet Perforations 2999.50 3000.80 0
1966-09-26 Selective Jet Perforations 3001.10 3002.00 0
1966-09-26 Selective Jet Perforations 3002.30 3008.40 0
1966-09-26 Selective Jet Perforations 3010.50 3013.60 0
1966-09-26 Selective Jet Perforations 3014.50 3014.80 0
1966-09-26 Selective Jet Perforations 3016.00 3016.30 0
1966-09-26 Selective Jet Perforations 3020.00 3021.50 0
1966-09-26 Selective Jet Perforations 3021.80 3022.10 0
1966-09-26 Selective Jet Perforations 3024.50 3027.00 0
1966-09-26 Selective Jet Perforations 3027.30 3028.50 0
1965-08-22 Selective Jet Perforations 2938.30 2938.60 0
1966-09-26 Selective Jet Perforations 3037.60 3038.20 0
1966-09-26 Selective Jet Perforations 3039.20 3040.40 0
1966-09-26 Selective Jet Perforations 3041.60 3042.50 0
1966-10-02 Acid Treatment 2929.10 3042.50 0
1966-10-14 Selective Jet Perforations 2929.10 2930.70 0
1966-10-14 Selective Jet Perforations 2933.70 2937.40 0
1966-10-14 Selective Jet Perforations 2938.30 2941.30 0
1966-10-14 Selective Jet Perforations 2945.00 2945.30 0
1966-10-14 Selective Jet Perforations 2998.00 2999.50 0
1966-10-14 Selective Jet Perforations 3000.80 3002.00 0
1965-08-22 Selective Jet Perforations 2941.30 2941.60 0
1966-10-14 Selective Jet Perforations 3002.30 3014.50 0
1966-10-14 Selective Jet Perforations 3016.00 3016.30 0
1966-10-14 Selective Jet Perforations 3020.00 3021.20 0
1966-10-14 Selective Jet Perforations 3022.10 3027.30 0
1966-10-14 Selective Jet Perforations 3028.50 3028.50 0
1966-10-14 Acid Treatment 2929.10 3028.50 0
1975-12-03 Cement Squeeze 2722.20 3042.50 0
1976-01-22 Perforation 4085.80 4088.90 7
1976-01-22 Perforation 4089.80 4092.90 7
1976-01-22 Perforation 4095.90 4099.00 7
1965-08-22 Selective Jet Perforations 2942.80 2942.80 0
1976-01-22 Perforation 4099.00 4102.00 7
1976-01-22 Perforation 4102.90 4106.00 7
1976-01-26 Acid Wash 4085.80 4106.00 0
1976-01-29 Acid Treatment 4085.80 4106.00 0
1976-01-31 Acid Treatment 4085.80 4106.00 0
1976-02-08 Fracture 4085.80 4106.00 0
1976-02-10 Alchohol Squeeze 4085.80 4106.00 0
1976-02-17 Perforation 4056.90 4059.90 7
1976-02-17 Perforation 4061.80 4067.90 7
1976-02-17 Perforation 4069.70 4075.80 7
1965-08-22 Selective Jet Perforations 2944.70 2945.00 0
1976-02-17 Perforation 4076.40 4079.40 7
1976-02-20 Acid Treatment 4056.90 4079.40 0
1976-02-22 Acid Treatment 4056.90 4079.40 0
1976-03-01 Perforation 4042.60 4047.10 7
1976-03-02 Perforation 4014.20 4018.80 7
1976-03-02 Perforation 4032.50 4037.10 7
1976-03-02 Perforation 4037.10 4041.60 7
1976-03-06 Acid Treatment 4014.20 4047.10 0
1976-03-07 Acid Treatment 4014.20 4047.10 0
1996-10-28 Packing Device Capped w/Cement 3984.00 3992.00 0
1965-08-22 Selective Jet Perforations 2954.10 2954.40 0
1965-08-26 Perforation 2750.80 2755.40 3
1965-10-15 Perforation 2722.20 2760.90 3

For data sources see[4]



References