X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0305103016004

Well Details

Well ID: 0305103016004
Loading map...
Location: 00/16-30-030-10W5/4
Location Alias: 00/16-30-30-10 W5M
Location Alias 2: 00/16-30-030-10 W5/04
Country: Canada
Province: Alberta
Township: 030
Meridian: 5
Range: 10
Section: 30
County/Municipality: Municipal District of Bighorn No. 8
Well Name: Canlin PANTHER 5-29-30-10
Operator Name: Canlin Energy Corporation
License Number: 0029329
License Date: 1965-11-05
License Status: Suspension
Spud Date: 1965-01-26
Final Drill Date: 1997-01-31
Well Total Depth: 5005.00 m
Surface Hole Latitude: 51.599631
Surface Hole Longitude: -115.385453

For data sources see[1][2]

Well History

Date Event
1965-11-05 Obtained License
1996-12-18 Direction Drilling Operation Performed - Horizontal
1996-12-29 Well Log Performed
1996-12-30 Well Log Performed
1997-01-31 Finished Drilling
1997-01-31 Well Mode changed to Drilled and Cased
1997-02-02 Well Log Performed
1997-02-04 Well Log Performed
1997-02-08 Liner Casing Operation Performed
1997-02-10 Rig Released
1997-02-25 Well Log Performed
1997-04-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-04 Perforation Treatment Performed - Jet Perforation
1997-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-07 Perforation Treatment Performed - Jet Perforation
1997-04-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-04-14 Perforation Treatment Performed - Multi-Stage Fracture
1997-04-25 Perforation Treatment Performed - Jet Perforation
1997-04-28 Perforation Treatment Performed - Multi-Stage Fracture
1997-05-05 Perforation Treatment Performed - Jet Perforation
1997-05-07 Perforation Treatment Performed - Multi-Stage Fracture
1997-05-08 Well Log Performed
1997-06-17 Perforation Treatment Performed - Jet Perforation
1997-06-18 Perforation Treatment Performed - Multi-Stage Fracture
1997-06-19 Well Began Production
1997-06-19 Well Fluid changed to Gas
1997-06-19 Well Mode changed to Flowing
2011-01-01 Well Fluid changed to Gas
2011-01-01 Well Mode changed to Suspended
2011-02-01 Perforation Treatment Performed - Cement Plug
2011-02-01 Plug Back Performed
2011-02-02 Perforation Treatment Performed - Cement Plug
2011-02-02 Plug Back Performed
2011-02-02 Well Fluid changed to Gas
2011-02-02 Well Mode changed to Abandoned Zone
2016-11-22 Well Log Performed
2016-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-11-23 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-12-18 3929.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-04-04 Perforation 4960.00 4960.60 4
1997-05-07 Multi-Stage Fracture 4350.00 4351.50 0
1997-06-17 Perforation 4647.60 4653.50 20
1997-06-18 Multi-Stage Fracture 4647.60 4653.50 0
2011-02-01 Cement Plug 3293.00 3490.80 0
2011-02-02 Cement Plug 2517.10 2639.30 0
2016-11-23 Packing Device Capped w/Cement 1919.00 1927.00 0
1997-04-04 Acid Treatment 4960.00 4960.60 0
1997-04-07 Perforation 4959.00 4960.50 20
1997-04-07 Acid Treatment 4959.00 4960.60 0
1997-04-13 Acid Treatment 4959.00 4960.60 0
1997-04-14 Multi-Stage Fracture 4959.00 4960.60 0
1997-04-25 Perforation 4650.00 4651.50 20
1997-04-28 Multi-Stage Fracture 4650.00 4651.50 0
1997-05-05 Perforation 4350.00 4351.50 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 4500 0.0 0.0 0.0
1998 8708 0.0 0.0 0.0
1999 8637 0.0 0.0 0.0
2000 8368 0.0 0.0 0.0
2001 8328 0.0 0.0 0.0
2002 4754 0.0 0.0 0.0
2003 8236 0.0 0.0 0.0
2004 7136 0.0 0.0 0.0
2005 7318 0.0 0.0 0.0
2006 8429 0.0 0.0 0.0
2007 8663 0.0 0.0 0.0
2008 8444 0.0 0.0 0.0
2009 8341 0.0 0.0 0.0
2010 3344 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-08-31 No Incident Encountered 0.00 0.00
2011-02-01 No Incident Encountered 0.00 0.00
2011-02-02 No Incident Encountered 0.00 0.00
2016-11-23 No Incident Encountered 0.00 0.00

For data sources see[7]

References