If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0305103103000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.599153,"lon":-115.386078,"icon":""}]} |
Location: 00/03-31-030-10W5/0 | |
Location Alias: 00/03-31-30-10 W5M | |
Location Alias 2: 00/03-31-030-10 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 5 | |
Range: 10 | |
Section: 31 | |
County/Municipality: Municipal District of Bighorn No. 8 | |
Well Name: Canlin PANTHER 3-31-30-10 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0319863 | |
License Date: 2004-11-26 | |
License Status: Amended | |
Spud Date: 2005-01-11 | |
Final Drill Date: 2005-05-16 | |
Well Total Depth: 5160.00 m | |
Surface Hole Latitude: 51.599153 | |
Surface Hole Longitude: -115.386078 |
Date | Event |
---|---|
2004-11-26 | Obtained License |
2005-01-17 | Surface Casing Operation Performed |
2005-02-28 | Direction Drilling Operation Performed - Deviate |
2005-03-08 | Well Log Performed |
2005-03-09 | Production Casing Operation Performed |
2005-04-08 | Well Log Performed |
2005-04-19 | Well Log Performed |
2005-04-22 | Liner Casing Operation Performed |
2005-04-29 | Direction Drilling Operation Performed - Horizontal |
2005-05-16 | Finished Drilling |
2005-05-16 | Perforation Treatment Performed - Open-Hole Completion |
2005-05-16 | Well Structure changed to Drain |
2005-05-25 | Well Log Performed |
2005-07-11 | Rig Released |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2005-02-28 | 2843.00 | Deviate (5 - 79 degrees) |
2005-04-29 | 4438.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-05-16 | Open Hole/Barefoot Completion | 4328.00 | 5160.00 | 0 |
For data sources see[5]