X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0305103113002

Well Details

Well ID: 0305103113002
Loading map...
Location: 00/13-31-030-10W5/2
Location Alias: 00/13-31-30-10 W5M
Location Alias 2: 00/13-31-030-10 W5/02
Country: Canada
Province: Alberta
Township: 030
Meridian: 5
Range: 10
Section: 31
County/Municipality: Municipal District of Bighorn No. 8
Well Name: Canlin PANTHER 3-31-30-10
Operator Name: Canlin Energy Corporation
License Number: 0319863
License Date: 2004-11-26
License Status: Amended
Spud Date: 2005-01-11
Final Drill Date: 2005-07-01
Well Total Depth: 6255.00 m
Surface Hole Latitude: 51.599153
Surface Hole Longitude: -115.386078

For data sources see[1][2]

Well History

Date Event
2004-11-26 Obtained License
2005-01-17 Surface Casing Operation Performed
2005-02-28 Direction Drilling Operation Performed - Deviate
2005-03-09 Production Casing Operation Performed
2005-04-22 Liner Casing Operation Performed
2005-04-29 Direction Drilling Operation Performed - Horizontal
2005-05-22 Direction Drilling Operation Performed - Sidetrack Fish
2005-07-01 Finished Drilling
2005-07-01 Well Mode changed to Drilled and Cased
2005-07-02 Well Log Performed
2005-07-03 Well Log Performed
2005-07-06 Perforation Treatment Performed - Open-Hole Completion
2005-07-11 Rig Released
2005-08-01 Well Began Production
2005-08-01 Well Fluid changed to Gas
2005-08-01 Well Mode changed to Flowing
2005-08-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-12-01 Well Fluid changed to Gas
2010-12-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-02-28 2843.00 Deviate (5 - 79 degrees)
2005-04-29 4438.00 Horizontal
2005-05-22 5103.00 Sidetrack fish

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-07-06 Open Hole/Barefoot Completion 4438.00 6255.00 0
2005-08-11 Acid Treatment 4438.00 6255.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 927 0.0 0.0 0.0
2006 8402 0.0 0.0 0.0
2007 7858 0.0 0.0 0.0
2008 5444 0.0 0.0 0.0
2009 6148 0.0 0.0 0.0
2010 8015 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8270 0.0 0.0 0.0
2013 8735 0.0 0.0 0.0
2014 8166 0.0 0.0 0.0
2015 7896 0.0 0.0 0.0
2016 5255 0.0 0.0 0.0
2017 8027 0.0 0.0 0.0
2018 4032 0.0 0.0 0.0
2019 3888 0.0 0.0 0.0
2020 288 0.0 0.0 0.0

For data sources see[6]

References