X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0305103202000

Well Details

Well ID: 0305103202000
Loading map...
Location: 00/02-32-030-10W5/0
Location Alias: 00/02-32-30-10 W5M
Location Alias 2: 00/02-32-030-10 W5/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 5
Range: 10
Section: 32
County/Municipality: Municipal District of Bighorn No. 8
Well Name: Canlin PANTHER 2-32-30-10
Operator Name: Canlin Energy Corporation
License Number: 0402587
License Date: 2008-10-21
License Status: Amended
Spud Date: 2008-12-08
Final Drill Date: 2009-03-04
Well Total Depth: 5483.00 m
Surface Hole Latitude: 51.600043
Surface Hole Longitude: -115.358364

For data sources see[1][2]

Well History

Date Event
2008-10-21 Obtained License
2008-12-12 Surface Casing Operation Performed
2009-01-14 Well Log Performed
2009-01-17 Intermediate Casing Operation Performed
2009-01-20 Direction Drilling Operation Performed - Deviate
2009-02-05 Well Log Performed
2009-02-09 Liner Casing Operation Performed
2009-02-12 Direction Drilling Operation Performed - Horizontal
2009-03-04 Finished Drilling
2009-03-04 Perforation Treatment Performed - Open-Hole Completion
2009-03-04 Well Log Performed
2009-03-04 Well Mode changed to Drilled and Cased
2009-03-05 Well Log Performed
2009-03-06 Well Log Performed
2009-03-07 Well Log Performed
2009-03-13 Rig Released
2009-04-01 Well Began Production
2009-04-01 Well Fluid changed to Gas
2009-04-01 Well Mode changed to Flowing
2009-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-01-01 Well Fluid changed to Gas
2011-01-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-01-20 3508.50 Deviate (5 - 79 degrees)
2009-02-12 4530.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-03-04 Open Hole/Barefoot Completion 4460.00 5483.00 0
2009-04-06 Acid Treatment 4460.00 5483.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 4412 0.0 0.0 0.0
2010 6623 0.0 0.0 0.0
2011 8015 0.0 0.0 0.0
2012 7415 0.0 0.0 0.0
2013 8735 0.0 0.0 0.0
2014 7048 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 7963 0.0 0.0 0.0
2017 8111 0.0 0.0 0.0
2018 3696 0.0 0.0 0.0
2019 2736 0.0 0.0 0.0
2020 1512 0.0 0.0 0.0

For data sources see[6]

References