X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0305112306000

Well Details

Well ID: 0305112306000
Loading map...
Location: 00/06-23-030-11W5/0
Location Alias: 00/06-23-30-11 W5M
Location Alias 2: 00/06-23-030-11 W5/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 5
Range: 11
Section: 23
County/Municipality: Municipal District of Bighorn No. 8
Well Name: TQN PANTHER 6-23-30-11
Operator Name: TAQA North Ltd.
License Number: 0021062
License Date: 1961-07-12
License Status: Suspension
Spud Date: 1961-07-31
Final Drill Date: 1962-02-26
Well Total Depth: 3811.50 m
Surface Hole Latitude: 51.582023
Surface Hole Longitude: -115.452708

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-07-12 Obtained License
1962-01-03 Drill Stem Test Performed
1962-02-07 Drill Stem Test Performed
1962-02-10 Drill Stem Test Performed
1962-02-26 Finished Drilling
1962-02-28 Drill Stem Test Performed
1962-03-03 Drill Stem Test Performed
1962-03-10 Drill Stem Test Performed
1962-03-11 Drill Stem Test Performed
1962-03-16 Production Casing Operation Performed
1962-03-26 Well Mode changed to Drilled and Cased
1962-03-27 Well Fluid changed to Gas
1962-03-27 Well Mode changed to Testing
1962-11-28 Perforation Treatment Performed - Jet Perforation
1962-12-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-12-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1962-12-05 Perforation Treatment Performed - Jet Perforation
1962-12-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-12-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1962-12-12 Perforation Treatment Performed - Jet Perforation
1962-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-12-29 Perforation Treatment Performed - Nitrogen Treatment
1963-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-01-08 Perforation Treatment Performed - Nitrogen Treatment
1985-06-08 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-11-28 Perforation 3776.50 3785.60 7
1962-12-10 Acid Treatment 3372.60 3504.30 0
1962-12-12 Packing Device Capped w/Cement 3291.80 3291.80 0
1962-12-12 Perforation 3261.40 3262.90 13
1962-12-12 Perforation 3265.90 3270.50 13
1962-12-12 Perforation 3271.70 3272.60 13
1962-12-15 Acid Treatment 3261.40 3272.60 0
1962-12-16 Acid Treatment 3261.40 3272.60 0
1962-12-29 Nitrogen Treatment 3261.40 3272.60 0
1963-01-06 Acid Treatment 3261.40 3272.60 0
1963-01-08 Nitrogen Treatment 3261.40 3272.60 0
1962-11-28 Perforation 3754.50 3760.00 7
1962-11-28 Perforation 3742.30 3752.10 7
1962-12-03 Acid Treatment 3742.30 3785.60 0
1962-12-05 Packing Device Capped w/Cement 3512.50 3512.50 0
1962-12-05 Perforation 3496.70 3504.30 7
1962-12-05 Perforation 3456.40 3465.60 7
1962-12-05 Perforation 3441.80 3444.20 7
1962-12-05 Perforation 3372.60 3374.10 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0

For data sources see[5]

References