X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314102506000

Well Details

Well ID: 0314102506000
Loading map...
Location: 00/06-25-031-10W4/0
Location Alias: 00/06-25-31-10 W4M
Location Alias 2: 00/06-25-031-10 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 10
Section: 25
County/Municipality: Special Areas No. 2
Well Name: MARL YNGSTN 6-25-31-10
Operator Name: Marlboro Energy Ltd.
License Number: 0014039
License Date: 1957-09-27
License Status: Issued
Spud Date: 1957-09-27
Final Drill Date: 1957-10-06
Well Total Depth: 1132.00 m
Surface Hole Latitude: 51.683519
Surface Hole Longitude: -111.295434

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-09-27 Obtained License
1957-10-06 Finished Drilling
1957-10-06 Well Mode changed to Drilled and Cased
1957-10-07 Production Casing Operation Performed
1957-11-14 Perforation Treatment Performed - Open-Hole Completion
1957-11-14 Well Began Production
1957-11-14 Well Fluid changed to Crude Oil
1957-11-14 Well Mode changed to Pumping
1968-05-05 Perforation Treatment Performed - Jet Perforation
1968-06-02 Well Fluid changed to Crude Oil
1968-06-02 Well Mode changed to Pumping
1968-07-19 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1968-07-23 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1969-07-15 Well Fluid changed to Crude Oil
1969-07-15 Well Mode changed to Suspended
1969-10-29 Perforation Treatment Performed - Cement Plug
1976-09-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-14 Perforation Treatment Performed - Jet Perforation
1979-09-14 Well Fluid changed to Crude Oil
1979-09-14 Well Mode changed to Abandoned Zone
1982-08-06 Perforation Treatment Performed - Open-Hole Completion
1982-08-09 Perforation Treatment Performed - Cement Plug

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-11-14 Open Hole/Barefoot Completion 1126.80 1130.50 0
1982-08-06 Open Hole/Barefoot Completion 1126.80 1132.00 0
1982-08-09 Cement Plug 1112.00 1132.00 0
1968-05-05 Perforation 1127.50 1129.90 3
1968-05-05 Perforation 871.70 877.80 3
1968-07-19 Resin-Gypsum Squeeze or Plug 1131.10 1132.00 0
1968-07-23 Resin-Gypsum Squeeze or Plug 1129.90 1129.90 0
1969-10-29 Cement Plug 1128.70 1129.90 0
1976-09-11 Packing Device Capped w/Cement 1116.80 1118.30 0
1976-09-13 Acid Treatment 871.70 877.80 0
1979-09-14 Perforation 940.60 943.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 576 0.0 0.0 0.0

For data sources see[5]

References