X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314123111000

Well Details

Well ID: 0314123111000
Loading map...
Location: 00/11-31-031-12W4/0
Location Alias: 00/11-31-31-12 W4M
Location Alias 2: 00/11-31-031-12 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 12
Section: 31
County/Municipality: Special Areas No. 2
Well Name: AVN RICHDALE 11-31-31-12
Operator Name: XTO Energy Canada ULC
License Number: 0077170
License Date: 1979-07-30
License Status: Abandoned
Spud Date: 1979-08-03
Final Drill Date: 1979-08-06
Well Total Depth: 1128.00 m
Surface Hole Latitude: 51.702042
Surface Hole Longitude: -111.697578

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-07-30 Obtained License
1979-08-06 Finished Drilling
1979-08-06 Well Mode changed to Drilled and Cased
1979-08-07 Drill Stem Test Performed
1979-08-09 Production Casing Operation Performed
1980-09-09 Perforation Treatment Performed - Jet Perforation
1980-11-06 Well Began Production
1980-11-06 Well Fluid changed to Crude Oil
1980-11-06 Well Mode changed to Pumping
1996-07-16 Well Log Performed
1996-11-07 Well Fluid changed to Crude Oil
1996-11-07 Well Mode changed to Closed
1996-12-03 Well Fluid changed to Crude Oil
1996-12-03 Well Mode changed to Pumping
1997-05-07 Well Began Injection
1997-05-07 Well Fluid changed to Water
1997-05-07 Well Type changed to Disposal
1997-10-28 Well Log Performed
2004-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-07-14 Perforation Treatment Performed - Jet Perforation
2004-07-14 Plug Back Performed
2004-07-14 Well Fluid changed to Water
2004-07-14 Well Log Performed
2004-07-14 Well Mode changed to Abandoned Zone
2004-07-14 Well Type changed to Disposal
2004-07-15 Perforation Treatment Performed - Fractured
2005-05-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-05-20 Plug Back Performed
2005-05-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-09-09 Perforation 1110.50 1112.50 12
2004-07-14 Packing Device Capped w/Cement 1098.00 1106.00 0
2004-07-14 Perforation 1087.50 1089.00 13
2004-07-15 Fracture 1087.50 1089.00 0
2005-05-20 Packing Device Capped w/Cement 1072.00 1080.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 1344 0.0 0.0 0.0
1981 8517 0.0 0.0 0.0
1982 8759 0.0 0.0 0.0
1983 8564 0.0 0.0 0.0
1984 8370 0.0 0.0 0.0
1985 7904 0.0 0.0 0.0
1986 8191 0.0 0.0 0.0
1987 7963 0.0 0.0 0.0
1988 6069 0.0 0.0 0.0
1989 6080 0.0 0.0 0.0
1990 7611 0.0 0.0 0.0
1991 5720 0.0 0.0 0.0
1992 8697 0.0 0.0 0.0
1993 8256 0.0 0.0 0.0
1994 7640 0.0 0.0 0.0
1995 48 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0

For data sources see[5]

References