If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0314172906023 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.68197,"lon":-112.382923,"icon":""}]} |
Location: 02/06-29-031-17W4/3 | |
Location Alias: 02/06-29-31-17 W4M | |
Location Alias 2: 02/06-29-031-17 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 031 | |
Meridian: 4 | |
Range: 17 | |
Section: 29 | |
County/Municipality: Starland County | |
Well Name: MARQUEE MICHI 6-29-31-17 | |
Operator Name: Prairie Provident Resources Canada Ltd. | |
License Number: 0422175 | |
License Date: 2010-07-27 | |
License Status: Issued | |
Spud Date: 2010-08-28 | |
Final Drill Date: 2010-08-28 | |
Well Total Depth: 1384.20 m | |
Surface Hole Latitude: 51.681970 | |
Surface Hole Longitude: -112.382923 |
Date | Event |
---|---|
2010-07-27 | Obtained License |
2010-08-28 | Finished Drilling |
2010-08-28 | Well Mode changed to Drilled and Cased |
2010-08-31 | Perforation Treatment Performed - Jet Perforation |
2010-09-03 | Perforation Treatment Performed - Jet Perforation |
2010-09-04 | Perforation Treatment Performed - Jet Perforation |
2010-09-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-09-09 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
2010-09-11 | Rig Released |
2010-11-08 | Well Began Production |
2010-11-08 | Well Fluid changed to Crude Oil |
2010-11-08 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-08-31 | Perforation | 628.00 | 630.00 | 13 |
2010-09-09 | Casing Patch | 628.00 | 630.00 | 0 |
2010-09-03 | Perforation | 1325.00 | 1328.00 | 13 |
2010-09-03 | Perforation | 1330.50 | 1332.00 | 13 |
2010-09-03 | Perforation | 1333.50 | 1335.00 | 13 |
2010-09-04 | Perforation | 1315.00 | 1319.00 | 20 |
2010-09-07 | Acid Treatment | 1333.50 | 1335.00 | 0 |
2010-09-07 | Acid Treatment | 1330.50 | 1332.00 | 0 |
2010-09-07 | Acid Treatment | 1325.00 | 1328.00 | 0 |
2010-09-07 | Acid Treatment | 1315.00 | 1319.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 1200 | 0.0 | 0.0 | 0.0 |
2011 | 8591 | 0.0 | 0.0 | 0.0 |
2012 | 7122 | 0.0 | 0.0 | 0.0 |
2013 | 8212 | 0.0 | 0.0 | 0.0 |
2014 | 8711 | 0.0 | 0.0 | 0.0 |
2015 | 8447 | 0.0 | 0.0 | 0.0 |
2016 | 8447 | 0.0 | 0.0 | 0.0 |
2017 | 8735 | 0.0 | 0.0 | 0.0 |
2018 | 7823 | 0.0 | 0.0 | 0.0 |
For data sources see[5]