If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0314230109002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.628529,"lon":-113.12438,"icon":""}]} |
| Location: 00/09-01-031-23W4/2 | |
| Location Alias: 00/09-01-31-23 W4M | |
| Location Alias 2: 00/09-01-031-23 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 031 | |
| Meridian: 4 | |
| Range: 23 | |
| Section: 01 | |
| County/Municipality: Kneehill County | |
| Well Name: EMBER GPINE 9-1-31-23 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0400861 | |
| License Date: 2008-09-12 | |
| License Status: Issued | |
| Spud Date: 2009-01-26 | |
| Final Drill Date: 2009-01-27 | |
| Well Total Depth: 839.00 m | |
| Surface Hole Latitude: 51.628529 | |
| Surface Hole Longitude: -113.124380 |
| Date | Event |
|---|---|
| 2008-09-12 | Obtained License |
| 2009-01-26 | Surface Casing Operation Performed |
| 2009-01-27 | Finished Drilling |
| 2009-01-27 | Production Casing Operation Performed |
| 2009-01-27 | Rig Released |
| 2009-01-27 | Well Mode changed to Drilled and Cased |
| 2009-01-30 | Well Log Performed |
| 2009-02-10 | Perforation Treatment Performed - Jet Perforation |
| 2009-02-15 | Perforation Treatment Performed - Fractured |
| 2009-06-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2009-06-17 | Perforation Treatment Performed - Jet Perforation |
| 2009-06-17 | Plug Back Performed |
| 2009-06-18 | Perforation Treatment Performed - Fractured |
| 2009-07-01 | Well Began Production |
| 2009-07-01 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2009-07-01 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2009-02-10 | Perforation | 613.00 | 615.00 | 20 |
| 2009-06-17 | Perforation | 489.10 | 489.60 | 13 |
| 2009-06-17 | Perforation | 481.50 | 482.00 | 13 |
| 2009-06-17 | Perforation | 474.30 | 474.80 | 13 |
| 2009-06-17 | Perforation | 472.70 | 473.20 | 13 |
| 2009-06-17 | Perforation | 462.00 | 465.00 | 13 |
| 2009-06-17 | Perforation | 450.20 | 450.70 | 13 |
| 2009-06-17 | Perforation | 422.40 | 423.40 | 13 |
| 2009-06-17 | Perforation | 411.20 | 411.70 | 13 |
| 2009-06-17 | Perforation | 409.00 | 410.00 | 13 |
| 2009-06-17 | Perforation | 405.40 | 406.40 | 13 |
| 2009-02-15 | Fracture | 613.00 | 615.00 | 0 |
| 2009-06-17 | Perforation | 404.10 | 404.60 | 13 |
| 2009-06-17 | Perforation | 397.20 | 397.70 | 13 |
| 2009-06-17 | Perforation | 383.90 | 384.90 | 13 |
| 2009-06-17 | Perforation | 382.70 | 383.20 | 13 |
| 2009-06-17 | Perforation | 381.50 | 382.50 | 13 |
| 2009-06-17 | Perforation | 373.60 | 374.60 | 13 |
| 2009-06-17 | Perforation | 372.40 | 372.90 | 13 |
| 2009-06-17 | Perforation | 365.00 | 366.50 | 13 |
| 2009-06-17 | Perforation | 343.00 | 345.50 | 13 |
| 2009-06-17 | Perforation | 299.80 | 300.30 | 13 |
| 2009-06-17 | Packing Device Capped w/Cement | 598.00 | 606.30 | 0 |
| 2009-06-17 | Perforation | 276.90 | 277.40 | 13 |
| 2009-06-17 | Perforation | 260.00 | 260.50 | 13 |
| 2009-06-17 | Perforation | 242.00 | 242.50 | 13 |
| 2009-06-18 | Fracture | 499.40 | 542.70 | 0 |
| 2009-06-18 | Fracture | 450.20 | 495.00 | 0 |
| 2009-06-18 | Fracture | 462.00 | 465.00 | 0 |
| 2009-06-18 | Fracture | 397.20 | 423.40 | 0 |
| 2009-06-18 | Fracture | 343.00 | 384.90 | 0 |
| 2009-06-18 | Fracture | 299.80 | 300.30 | 0 |
| 2009-06-18 | Fracture | 242.00 | 277.40 | 0 |
| 2009-06-17 | Perforation | 542.20 | 542.70 | 13 |
| 2009-06-17 | Perforation | 526.60 | 527.60 | 13 |
| 2009-06-17 | Perforation | 508.50 | 509.00 | 13 |
| 2009-06-17 | Perforation | 506.60 | 507.10 | 13 |
| 2009-06-17 | Perforation | 499.40 | 499.90 | 13 |
| 2009-06-17 | Perforation | 494.50 | 495.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2009 | 3188 | 0.0 | 0.0 | 0.0 |
| 2010 | 979 | 0.0 | 0.0 | 0.0 |
| 2011 | 2463 | 0.0 | 0.0 | 0.0 |
| 2012 | 8731 | 0.0 | 0.0 | 0.0 |
| 2013 | 8691 | 0.0 | 0.0 | 0.0 |
| 2014 | 8701 | 0.0 | 0.0 | 0.0 |
| 2015 | 8546 | 0.0 | 0.0 | 0.0 |
| 2016 | 8783 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]