If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0314250402000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.622279,"lon":-113.48755,"icon":""}]} |
| Location: 00/02-04-031-25W4/0 | |
| Location Alias: 00/02-04-31-25 W4M | |
| Location Alias 2: 00/02-04-031-25 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 031 | |
| Meridian: 4 | |
| Range: 25 | |
| Section: 04 | |
| County/Municipality: Kneehill County | |
| Well Name: EMBER TWINING 2-4-31-25 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0422387 | |
| License Date: 2010-08-05 | |
| License Status: Issued | |
| Spud Date: 2010-11-04 | |
| Final Drill Date: 2010-11-25 | |
| Well Total Depth: 988.00 m | |
| Surface Hole Latitude: 51.622279 | |
| Surface Hole Longitude: -113.487550 |
| Date | Event |
|---|---|
| 2010-08-05 | Obtained License |
| 2010-11-04 | Surface Casing Operation Performed |
| 2010-11-25 | Finished Drilling |
| 2010-11-25 | Production Casing Operation Performed |
| 2010-11-25 | Rig Released |
| 2010-11-25 | Well Mode changed to Drilled and Cased |
| 2010-11-30 | Well Log Performed |
| 2010-12-07 | Well Log Performed |
| 2011-01-05 | Perforation Treatment Performed - Jet Perforation |
| 2011-01-11 | Perforation Treatment Performed - Fractured |
| 2011-01-14 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-01-14 | Well Mode changed to Testing |
| 2011-02-08 | Well Began Production |
| 2011-02-08 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-02-08 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-01-05 | Perforation | 487.60 | 491.10 | 13 |
| 2011-01-05 | Perforation | 475.00 | 478.00 | 13 |
| 2011-01-05 | Perforation | 444.00 | 445.00 | 13 |
| 2011-01-05 | Perforation | 245.40 | 246.40 | 13 |
| 2011-01-05 | Perforation | 352.70 | 353.20 | 13 |
| 2011-01-05 | Perforation | 265.20 | 265.70 | 13 |
| 2011-01-05 | Perforation | 249.40 | 249.90 | 13 |
| 2011-01-05 | Perforation | 538.70 | 539.20 | 13 |
| 2011-01-05 | Perforation | 628.00 | 628.50 | 13 |
| 2011-01-05 | Perforation | 623.90 | 624.90 | 13 |
| 2011-01-05 | Perforation | 612.80 | 614.30 | 13 |
| 2011-01-05 | Perforation | 484.20 | 484.70 | 13 |
| 2011-01-05 | Perforation | 629.70 | 630.70 | 13 |
| 2011-01-05 | Perforation | 644.70 | 645.70 | 13 |
| 2011-01-05 | Perforation | 641.60 | 642.10 | 13 |
| 2011-01-05 | Perforation | 640.20 | 640.70 | 13 |
| 2011-01-05 | Perforation | 554.70 | 556.70 | 13 |
| 2011-01-05 | Perforation | 551.00 | 551.50 | 13 |
| 2011-01-05 | Perforation | 553.80 | 554.30 | 13 |
| 2011-01-05 | Perforation | 586.30 | 587.30 | 13 |
| 2011-01-05 | Perforation | 598.50 | 600.00 | 13 |
| 2011-01-05 | Perforation | 610.80 | 612.30 | 13 |
| 2011-01-05 | Perforation | 437.90 | 438.40 | 13 |
| 2011-01-05 | Perforation | 589.00 | 589.50 | 13 |
| 2011-01-11 | Fracture | 444.00 | 478.00 | 0 |
| 2011-01-11 | Fracture | 640.20 | 645.70 | 0 |
| 2011-01-11 | Fracture | 243.90 | 630.70 | 0 |
| 2011-01-05 | Perforation | 494.70 | 495.20 | 13 |
| 2011-01-05 | Perforation | 536.20 | 536.70 | 13 |
| 2011-01-05 | Perforation | 505.70 | 506.20 | 13 |
| 2011-01-05 | Perforation | 497.80 | 498.30 | 13 |
| 2011-01-05 | Perforation | 384.30 | 384.80 | 13 |
| 2011-01-05 | Perforation | 243.90 | 244.40 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 7858 | 0.0 | 0.0 | 0.0 |
| 2012 | 8668 | 0.0 | 0.0 | 0.0 |
| 2013 | 8751 | 0.0 | 0.0 | 0.0 |
| 2014 | 8734 | 0.0 | 0.0 | 0.0 |
| 2015 | 8749 | 0.0 | 0.0 | 0.0 |
| 2016 | 8782 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]