If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0314250410020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.628859,"lon":-113.486265,"icon":""}]} |
| Location: 02/10-04-031-25W4/0 | |
| Location Alias: 02/10-04-31-25 W4M | |
| Location Alias 2: 02/10-04-031-25 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 031 | |
| Meridian: 4 | |
| Range: 25 | |
| Section: 04 | |
| County/Municipality: Kneehill County | |
| Well Name: EMBER 102 TWINING 10-4-31-25 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0422391 | |
| License Date: 2010-08-05 | |
| License Status: Issued | |
| Spud Date: 2010-10-29 | |
| Final Drill Date: 2010-11-22 | |
| Well Total Depth: 998.00 m | |
| Surface Hole Latitude: 51.628859 | |
| Surface Hole Longitude: -113.486265 |
| Date | Event |
|---|---|
| 2010-08-05 | Obtained License |
| 2010-10-29 | Surface Casing Operation Performed |
| 2010-11-22 | Finished Drilling |
| 2010-11-22 | Production Casing Operation Performed |
| 2010-11-22 | Rig Released |
| 2010-11-22 | Well Mode changed to Drilled and Cased |
| 2010-11-30 | Well Log Performed |
| 2011-01-07 | Perforation Treatment Performed - Jet Perforation |
| 2011-01-11 | Perforation Treatment Performed - Fractured |
| 2011-01-15 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-01-15 | Well Mode changed to Testing |
| 2011-02-08 | Well Began Production |
| 2011-02-08 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-02-08 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-01-07 | Perforation | 493.10 | 494.60 | 13 |
| 2011-01-07 | Perforation | 531.60 | 532.10 | 13 |
| 2011-01-07 | Perforation | 573.00 | 577.50 | 13 |
| 2011-01-07 | Perforation | 521.50 | 525.00 | 13 |
| 2011-01-07 | Perforation | 527.00 | 531.00 | 13 |
| 2011-01-07 | Perforation | 308.40 | 308.90 | 13 |
| 2011-01-07 | Perforation | 360.90 | 361.90 | 13 |
| 2011-01-07 | Perforation | 577.50 | 580.00 | 13 |
| 2011-01-07 | Perforation | 274.10 | 274.60 | 13 |
| 2011-01-07 | Perforation | 541.30 | 541.80 | 13 |
| 2011-01-07 | Perforation | 638.90 | 639.40 | 13 |
| 2011-01-07 | Perforation | 494.60 | 497.10 | 13 |
| 2011-01-07 | Perforation | 641.40 | 642.40 | 13 |
| 2011-01-07 | Perforation | 623.10 | 626.10 | 13 |
| 2011-01-07 | Perforation | 634.70 | 635.70 | 13 |
| 2011-01-07 | Perforation | 652.60 | 653.10 | 13 |
| 2011-01-07 | Perforation | 654.70 | 655.70 | 13 |
| 2011-01-07 | Perforation | 643.00 | 643.50 | 13 |
| 2011-01-07 | Perforation | 651.10 | 651.60 | 13 |
| 2011-01-07 | Perforation | 557.10 | 558.10 | 13 |
| 2011-01-07 | Perforation | 560.70 | 561.20 | 13 |
| 2011-01-07 | Perforation | 542.70 | 543.20 | 13 |
| 2011-01-07 | Perforation | 446.60 | 447.10 | 13 |
| 2011-01-07 | Perforation | 553.70 | 554.20 | 13 |
| 2011-01-07 | Perforation | 601.10 | 601.60 | 13 |
| 2011-01-07 | Perforation | 610.10 | 611.60 | 13 |
| 2011-01-07 | Perforation | 598.40 | 599.40 | 13 |
| 2011-01-07 | Perforation | 596.90 | 597.90 | 13 |
| 2011-01-11 | Fracture | 521.50 | 580.00 | 0 |
| 2011-01-11 | Fracture | 651.10 | 655.70 | 0 |
| 2011-01-11 | Fracture | 274.10 | 643.50 | 0 |
| 2011-01-07 | Perforation | 491.40 | 491.90 | 13 |
| 2011-01-07 | Perforation | 534.30 | 534.80 | 13 |
| 2011-01-07 | Perforation | 538.20 | 538.70 | 13 |
| 2011-01-07 | Perforation | 499.80 | 500.30 | 13 |
| 2011-01-07 | Perforation | 502.50 | 503.00 | 13 |
| 2011-01-07 | Perforation | 366.60 | 367.10 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 7858 | 0.0 | 0.0 | 0.0 |
| 2012 | 8668 | 0.0 | 0.0 | 0.0 |
| 2013 | 8751 | 0.0 | 0.0 | 0.0 |
| 2014 | 8734 | 0.0 | 0.0 | 0.0 |
| 2015 | 8749 | 0.0 | 0.0 | 0.0 |
| 2016 | 8782 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]