If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0314250503000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.622064,"lon":-113.521231,"icon":""}]} |
| Location: 00/03-05-031-25W4/0 | |
| Location Alias: 00/03-05-31-25 W4M | |
| Location Alias 2: 00/03-05-031-25 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 031 | |
| Meridian: 4 | |
| Range: 25 | |
| Section: 05 | |
| County/Municipality: Kneehill County | |
| Well Name: EMBER TWINING 3-5-31-25 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0423123 | |
| License Date: 2010-09-01 | |
| License Status: Issued | |
| Spud Date: 2010-11-03 | |
| Final Drill Date: 2010-11-04 | |
| Well Total Depth: 1017.00 m | |
| Surface Hole Latitude: 51.622064 | |
| Surface Hole Longitude: -113.521231 |
| Date | Event |
|---|---|
| 2010-09-01 | Obtained License |
| 2010-11-03 | Direction Drilling Operation Performed - Deviate |
| 2010-11-03 | Surface Casing Operation Performed |
| 2010-11-04 | Finished Drilling |
| 2010-11-04 | Production Casing Operation Performed |
| 2010-11-04 | Rig Released |
| 2010-11-04 | Well Mode changed to Drilled and Cased |
| 2010-11-09 | Well Log Performed |
| 2010-12-22 | Perforation Treatment Performed - Jet Perforation |
| 2010-12-29 | Perforation Treatment Performed - Fractured |
| 2011-01-03 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-01-03 | Well Mode changed to Testing |
| 2011-02-15 | Well Began Production |
| 2011-02-15 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-02-15 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2010-11-03 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-12-22 | Perforation | 513.80 | 515.80 | 13 |
| 2010-12-22 | Perforation | 499.00 | 500.00 | 13 |
| 2010-12-22 | Perforation | 466.00 | 467.00 | 13 |
| 2010-12-22 | Perforation | 371.10 | 371.60 | 13 |
| 2010-12-22 | Perforation | 393.80 | 394.30 | 13 |
| 2010-12-22 | Perforation | 383.70 | 384.20 | 13 |
| 2010-12-22 | Perforation | 379.10 | 379.60 | 13 |
| 2010-12-22 | Perforation | 812.50 | 814.50 | 13 |
| 2010-12-22 | Perforation | 673.90 | 674.40 | 13 |
| 2010-12-22 | Perforation | 671.60 | 672.10 | 13 |
| 2010-12-22 | Perforation | 897.00 | 897.50 | 13 |
| 2010-12-22 | Perforation | 511.80 | 513.80 | 13 |
| 2010-12-22 | Perforation | 974.70 | 975.20 | 13 |
| 2010-12-22 | Perforation | 943.00 | 943.50 | 13 |
| 2010-12-22 | Perforation | 931.50 | 932.00 | 13 |
| 2010-12-22 | Perforation | 669.90 | 670.90 | 13 |
| 2010-12-22 | Perforation | 615.50 | 616.50 | 13 |
| 2010-12-22 | Perforation | 627.60 | 629.10 | 13 |
| 2010-12-22 | Perforation | 618.10 | 619.10 | 13 |
| 2010-12-22 | Perforation | 642.70 | 645.70 | 13 |
| 2010-12-22 | Perforation | 659.50 | 661.50 | 13 |
| 2010-12-22 | Perforation | 655.50 | 656.50 | 13 |
| 2010-12-22 | Perforation | 508.10 | 508.60 | 13 |
| 2010-12-29 | Fracture | 466.00 | 570.00 | 0 |
| 2010-12-29 | Fracture | 659.50 | 674.40 | 0 |
| 2010-12-29 | Fracture | 371.10 | 656.50 | 0 |
| 2010-12-22 | Perforation | 560.80 | 561.80 | 13 |
| 2010-12-22 | Perforation | 583.60 | 584.10 | 13 |
| 2010-12-22 | Perforation | 580.50 | 581.00 | 13 |
| 2010-12-22 | Perforation | 576.50 | 577.00 | 13 |
| 2010-12-22 | Perforation | 438.00 | 438.50 | 13 |
| 2010-12-22 | Perforation | 568.50 | 570.00 | 13 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 7690 | 0.0 | 0.0 | 0.0 |
| 2012 | 8668 | 0.0 | 0.0 | 0.0 |
| 2013 | 8751 | 0.0 | 0.0 | 0.0 |
| 2014 | 8734 | 0.0 | 0.0 | 0.0 |
| 2015 | 8749 | 0.0 | 0.0 | 0.0 |
| 2016 | 8782 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]