If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0315011011002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.642581,"lon":-114.061528,"icon":""}]} |
Location: 00/11-10-031-01W5/2 | |
Location Alias: 00/11-10-31-01 W5M | |
Location Alias 2: 00/11-10-031-01 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 031 | |
Meridian: 5 | |
Range: 01 | |
Section: 10 | |
County/Municipality: Mountain View County | |
Well Name: NAL CROSSE 11-10-31-1 | |
Operator Name: NAL Resources Limited | |
License Number: 0165131 | |
License Date: 1994-02-15 | |
License Status: Suspension | |
Spud Date: 1994-03-25 | |
Final Drill Date: 1994-04-16 | |
Well Total Depth: 2670.00 m | |
Surface Hole Latitude: 51.642581 | |
Surface Hole Longitude: -114.061528 |
Date | Event |
---|---|
1994-02-15 | Obtained License |
1994-03-28 | Surface Casing Operation Performed |
1994-04-16 | Finished Drilling |
1994-04-16 | Well Mode changed to Drilled and Cased |
1994-04-17 | Well Log Performed |
1994-04-18 | Drill Stem Test Performed |
1994-04-21 | Drill Stem Test Performed |
1994-04-22 | Drill Stem Test Performed |
1994-04-24 | Production Casing Operation Performed |
1994-04-25 | Rig Released |
1994-08-11 | Well Log Performed |
1994-08-12 | Perforation Treatment Performed - Jet Perforation |
1994-08-12 | Well Log Performed |
1994-08-16 | Perforation Treatment Performed - Fractured |
2011-05-23 | Well Log Performed |
2011-05-24 | Well Log Performed |
2011-05-27 | Well Log Performed |
2011-05-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-05-28 | Perforation Treatment Performed - Jet Perforation |
2011-05-28 | Plug Back Performed |
2011-05-28 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-08-12 | Perforation | 2613.00 | 2617.00 | 14 |
1994-08-12 | Perforation | 2620.00 | 2632.00 | 14 |
1994-08-16 | Fracture | 2613.00 | 2632.00 | 0 |
2011-05-28 | Packing Device Capped w/Cement | 2552.00 | 2560.00 | 0 |
2011-05-28 | Perforation | 2493.00 | 2504.00 | 14 |
For data sources see[4]