X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0315031102000

Well Details

Well ID: 0315031102000
Loading map...
Location: 00/02-11-031-03W5/0
Location Alias: 00/02-11-31-03 W5M
Location Alias 2: 00/02-11-031-03 W5/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 5
Range: 03
Section: 11
County/Municipality: Mountain View County
Well Name: TRANSGLOBE HARME 2-11-31-3
Operator Name: TransGlobe Energy Corporation
License Number: 0458367
License Date: 2013-08-02
License Status: Issued
Spud Date: 2013-08-29
Final Drill Date: 2013-09-08
Well Total Depth: 3297.00 m
Surface Hole Latitude: 51.648587
Surface Hole Longitude: -114.319417

For data sources see[1][2]

Well History

Date Event
2013-08-02 Obtained License
2013-08-30 Surface Casing Operation Performed
2013-09-02 Direction Drilling Operation Performed - Deviate
2013-09-02 Direction Drilling Operation Performed - Horizontal
2013-09-03 Well Log Performed
2013-09-05 Intermediate Casing Operation Performed
2013-09-08 Finished Drilling
2013-09-08 Well Log Performed
2013-09-08 Well Mode changed to Drilled and Cased
2013-09-09 Liner Casing Operation Performed
2013-09-09 Perforation Treatment Performed - Open-Hole Completion
2013-09-10 Rig Released
2013-09-14 Well Log Performed
2013-09-24 Perforation Treatment Performed - Multi-Stage Fracture
2013-09-25 Perforation Treatment Performed - Multi-Stage Fracture
2013-09-27 Well Began Production
2013-09-27 Well Fluid changed to Crude Oil
2013-09-27 Well Mode changed to Flowing
2018-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-08-29 Precision Drilling Corporation 377 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-09-02 1691.40 Deviate (5 - 79 degrees)
2013-09-02 2079.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-09-09 Open Hole/Barefoot Completion 3295.00 3297.00 0
2013-09-24 Multi-Stage Fracture 2938.80 2938.90 0
2013-09-24 Multi-Stage Fracture 2884.50 2884.60 0
2013-09-24 Multi-Stage Fracture 2855.40 2855.50 0
2013-09-24 Multi-Stage Fracture 2801.40 2801.50 0
2013-09-24 Multi-Stage Fracture 2759.50 2759.60 0
2013-09-24 Multi-Stage Fracture 2705.50 2705.60 0
2013-09-25 Multi-Stage Fracture 2676.20 2676.30 0
2013-09-25 Multi-Stage Fracture 2621.70 2621.80 0
2013-09-25 Multi-Stage Fracture 2592.20 2592.30 0
2013-09-25 Multi-Stage Fracture 2550.60 2550.70 0
2013-09-24 Multi-Stage Fracture 3273.10 3274.20 0
2013-09-25 Multi-Stage Fracture 2497.20 2497.30 0
2013-09-25 Multi-Stage Fracture 2443.80 2443.90 0
2013-09-25 Multi-Stage Fracture 2415.70 2415.80 0
2013-09-25 Multi-Stage Fracture 2362.60 2362.70 0
2013-09-25 Multi-Stage Fracture 2334.40 2334.50 0
2013-09-25 Multi-Stage Fracture 2267.60 2267.70 0
2013-09-25 Multi-Stage Fracture 2225.90 2226.00 0
2013-09-25 Multi-Stage Fracture 2184.00 2184.10 0
2018-03-03 Acid Treatment 2184.00 3273.20 0
2013-09-24 Multi-Stage Fracture 3223.80 3223.90 0
2013-09-24 Multi-Stage Fracture 3195.80 3195.90 0
2013-09-24 Multi-Stage Fracture 3142.30 3142.40 0
2013-09-24 Multi-Stage Fracture 3114.00 3114.10 0
2013-09-24 Multi-Stage Fracture 3061.40 3061.50 0
2013-09-24 Multi-Stage Fracture 3020.60 3020.70 0
2013-09-24 Multi-Stage Fracture 2968.10 2968.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-09-24 2013-09-25 1,954 3,998 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 81.9794 N/A
FRAC SAND. 30/50 WHITE Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 6.3966 N/A
FRAC SAND. 40/70 WHITE Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 4.2794 N/A
FRAC SAND.70/140 OR 50/140 CANADIAN Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 0.5335 N/A
Breaker V Baker Hughes Breaker Non-hazardous Not Available 100 0.0983 N/A
Sodium hypochlorite 7681-52-9 100 0.0983 N/A
CC-2 Baker Hughes Clay Control Non-hazardous Not Available 100 0.1803 N/A
Nitrogen Baker Hughes Energizing Fluid Nitrogen 7727-37-9 100 6.3718 N/A
FRW-31 Baker Hughes Friction Reducer Distillates. hydrotreated middle. petroleum 64742-46-7 100 0.0852 N/A
Non-hazardous Not Available 100 0.0852 N/A
InFlo 200 Baker Hughes Surfactant Alcohol 8648 100 0.0751 N/A
Alkyl alkoxylate 8648 100 0.0751 N/A
Glycol 8648 100 0.0751 N/A
Terpene 6896 100 0.0751 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-09-19 2013-09-21 Surface Water - Lake 3541
2013-09-16 2013-09-16 Waste Water - Municipal 707
2013-09-16 2013-09-16 Municipal Water 29
2013-09-14 2013-09-14 Recycled Fracturing Water (treated at well site) 634

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 2112 0.0 0.0 0.0
2014 8669 0.0 0.0 0.0
2015 8739 0.0 0.0 0.0
2016 8679 0.0 0.0 0.0
2017 6575 0.0 0.0 0.0
2018 1975 0.0 0.0 0.0
2019 6651 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-09-13 No Incident Encountered 0.00 0.00
2013-10-06 No Incident Encountered 0.00 0.00
2018-03-08 No Incident Encountered 0.00 0.00

For data sources see[10]

References