X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0315031608000

Well Details

Well ID: 0315031608000
Loading map...
Location: 00/08-16-031-03W5/0
Location Alias: 00/08-16-31-03 W5M
Location Alias 2: 00/08-16-031-03 W5/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 5
Range: 03
Section: 16
County/Municipality: Mountain View County
Well Name: TRANSGLOBE HARME 8-16-31-3
Operator Name: TransGlobe Energy Corporation
License Number: 0422677
License Date: 2010-08-16
License Status: Amended
Spud Date: 2010-08-29
Final Drill Date: 2010-09-23
Well Total Depth: 3599.00 m
Surface Hole Latitude: 51.666061
Surface Hole Longitude: -114.354627

For data sources see[1][2]

Well History

Date Event
2010-08-16 Obtained License
2010-08-30 Surface Casing Operation Performed
2010-09-02 Well Log Performed
2010-09-07 Direction Drilling Operation Performed - Horizontal
2010-09-10 Well Log Performed
2010-09-12 Intermediate Casing Operation Performed
2010-09-14 Well Log Performed
2010-09-23 Finished Drilling
2010-09-23 Well Log Performed
2010-09-23 Well Mode changed to Drilled and Cased
2010-09-30 Liner Casing Operation Performed
2010-10-01 Rig Released
2010-10-14 Well Log Performed
2010-10-25 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-10-25 Perforation Treatment Performed - Fractured
2010-10-26 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-10-27 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-10-27 Perforation Treatment Performed - Fractured
2010-10-28 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-10-28 Perforation Treatment Performed - Fractured
2010-10-29 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-10-29 Perforation Treatment Performed - Fractured
2010-10-30 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-10-30 Perforation Treatment Performed - Fractured
2010-12-16 Well Began Production
2010-12-16 Well Fluid changed to Crude Oil
2010-12-16 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-09-07 2012.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-10-25 Hydra Jet Perforation 3574.00 3575.00 3
2010-10-27 Fracture 3189.00 3190.00 0
2010-10-28 Hydra Jet Perforation 2856.00 2857.00 3
2010-10-28 Fracture 2856.00 2857.00 0
2010-10-29 Hydra Jet Perforation 2770.00 2771.00 3
2010-10-29 Fracture 2770.00 2771.00 0
2010-10-30 Hydra Jet Perforation 2664.00 2665.00 3
2010-10-30 Hydra Jet Perforation 2650.00 2651.00 3
2010-10-30 Hydra Jet Perforation 2484.00 2485.00 3
2010-10-30 Fracture 2484.00 2485.00 0
2010-10-30 Hydra Jet Perforation 2448.00 2449.00 3
2010-10-25 Fracture 3574.00 3575.00 0
2010-10-30 Fracture 2448.00 2449.00 0
2010-10-26 Hydra Jet Perforation 3469.00 3470.00 3
2010-10-26 Hydra Jet Perforation 3439.00 3440.00 3
2010-10-27 Hydra Jet Perforation 3429.00 3430.00 3
2010-10-27 Hydra Jet Perforation 3419.00 3420.00 3
2010-10-27 Hydra Jet Perforation 3246.00 3247.00 3
2010-10-27 Fracture 3246.00 3247.00 0
2010-10-27 Hydra Jet Perforation 3189.00 3190.00 3

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 456 0.0 0.0 0.0
2011 8400 0.0 0.0 0.0
2012 8417 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8725 0.0 0.0 0.0
2015 8504 0.0 0.0 0.0
2016 8767 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8231 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References