If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0315033110002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.7058,"lon":-114.4122,"icon":""}]} |
| Location: 00/10-31-031-03W5/2 | |
| Location Alias: 00/10-31-31-03 W5M | |
| Location Alias 2: 00/10-31-031-03 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 031 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 31 | |
| County/Municipality: Mountain View County | |
| Well Name: MOBIL UNIT HARME 10-31-31-3 | |
| Operator Name: ExxonMobil Canada Ltd. | |
| License Number: 0018153 | |
| License Date: 1959-11-19 | |
| License Status: Abandoned | |
| Spud Date: 1959-11-28 | |
| Final Drill Date: 1994-09-02 | |
| Well Total Depth: 3216.00 m | |
| Surface Hole Latitude: 51.705800 | |
| Surface Hole Longitude: -114.412200 |
| Date | Event |
|---|---|
| 1959-11-19 | Obtained License |
| 1994-08-14 | Well Log Performed |
| 1994-08-15 | Direction Drilling Operation Performed - Horizontal |
| 1994-08-17 | Well Log Performed |
| 1994-09-02 | Finished Drilling |
| 1994-09-02 | Perforation Treatment Performed - Open-Hole Completion |
| 1994-09-02 | Well Mode changed to Drilled and Cased |
| 1994-09-04 | Well Log Performed |
| 1994-09-06 | Well Log Performed |
| 1994-09-07 | Rig Released |
| 1994-10-07 | Well Began Production |
| 1994-10-07 | Well Fluid changed to Crude Oil |
| 1994-10-07 | Well Mode changed to Flowing |
| 1995-02-24 | Well Log Performed |
| 2000-10-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2000-10-26 | Plug Back Performed |
| 2000-10-26 | Well Fluid changed to Crude Oil |
| 2000-10-26 | Well Mode changed to Abandoned Zone |
| 2016-10-17 | Perforation Treatment Performed - Jet Perforation |
| 2016-10-17 | Perforation Treatment Performed - Remedial Casing |
| 2016-10-17 | Well Log Performed |
| 2016-10-18 | Perforation Treatment Performed - Cement Plug |
| 2016-10-18 | Plug Back Performed |
| 2016-10-19 | Perforation Treatment Performed - Cement Plug |
| 2016-10-20 | Perforation Treatment Performed - Jet Perforation |
| 2016-10-20 | Perforation Treatment Performed - Remedial Casing |
| 2016-10-20 | Well Log Performed |
| 2016-10-25 | Perforation Treatment Performed - Cement Plug |
| 2016-10-26 | Perforation Treatment Performed - Jet Perforation |
| 2016-10-26 | Well Log Performed |
| 2016-10-27 | Perforation Treatment Performed - Cement Plug |
| 2016-10-27 | Perforation Treatment Performed - Remedial Casing |
| 2019-01-24 | Well Abandoned |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1994-08-15 | 2541.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1994-09-02 | Open Hole/Barefoot Completion | 2546.00 | 3216.00 | 0 |
| 2016-10-25 | Cement Plug | 593.20 | 1356.00 | 0 |
| 2016-10-26 | Perforation | 539.00 | 540.00 | 17 |
| 2016-10-26 | Perforation | 482.00 | 483.00 | 17 |
| 2016-10-26 | Perforation | 412.00 | 413.00 | 17 |
| 2016-10-26 | Perforation | 362.00 | 363.00 | 17 |
| 2016-10-26 | Perforation | 322.00 | 323.00 | 17 |
| 2016-10-26 | Perforation | 285.00 | 286.00 | 17 |
| 2016-10-26 | Perforation | 232.00 | 233.00 | 17 |
| 2016-10-26 | Perforation | 204.00 | 205.00 | 17 |
| 2016-10-26 | Perforation | 197.00 | 198.00 | 17 |
| 2000-10-26 | Packing Device Capped w/Cement | 2507.00 | 2515.00 | 0 |
| 2016-10-27 | Remedial Casing Cementing | 197.00 | 540.00 | 0 |
| 2016-10-27 | Cement Plug | 190.20 | 593.00 | 0 |
| 2016-10-27 | Cement Plug | 165.00 | 190.00 | 0 |
| 2016-10-17 | Perforation | 2069.00 | 2070.00 | 17 |
| 2016-10-17 | Perforation | 1399.00 | 1400.00 | 17 |
| 2016-10-17 | Remedial Casing Cementing | 1399.00 | 2070.00 | 0 |
| 2016-10-18 | Cement Plug | 2115.40 | 2507.00 | 0 |
| 2016-10-19 | Cement Plug | 1356.00 | 2115.40 | 0 |
| 2016-10-20 | Perforation | 600.00 | 601.00 | 17 |
| 2016-10-20 | Remedial Casing Cementing | 600.00 | 601.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1994 | 1833 | 0.0 | 0.0 | 0.0 |
| 1995 | 7856 | 0.0 | 0.0 | 0.0 |
| 1996 | 3094 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2016-10-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]