X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0315033307000

Well Details

Well ID: 0315033307000
Loading map...
Location: 00/07-33-031-03W5/0
Location Alias: 00/07-33-31-03 W5M
Location Alias 2: 00/07-33-031-03 W5/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 5
Range: 03
Section: 33
County/Municipality: Mountain View County
Well Name: MOBIL UNIT HZ HARME 7-33-31-3
Operator Name: ExxonMobil Canada Ltd.
License Number: 0203359
License Date: 1997-07-11
License Status: Suspension
Spud Date: 1997-07-23
Final Drill Date: 1997-08-25
Well Total Depth: 2919.00 m
Surface Hole Latitude: 51.693797
Surface Hole Longitude: -114.362887

For data sources see[1][2]

Well History

Date Event
1997-07-11 Obtained License
1997-07-25 Surface Casing Operation Performed
1997-08-07 Direction Drilling Operation Performed - Horizontal
1997-08-11 Well Log Performed
1997-08-12 Well Log Performed
1997-08-14 Production Casing Operation Performed
1997-08-25 Finished Drilling
1997-08-25 Perforation Treatment Performed - Open-Hole Completion
1997-08-25 Well Log Performed
1997-08-25 Well Mode changed to Drilled and Cased
1997-08-26 Well Log Performed
1997-08-27 Rig Released
1997-09-05 Well Began Production
1997-09-05 Well Fluid changed to Crude Oil
1997-09-05 Well Mode changed to Pumping
1997-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-04 Plug Back Performed
2003-03-04 Well Fluid changed to Crude Oil
2003-03-04 Well Mode changed to Abandoned Zone
2003-03-08 Perforation Treatment Performed - Jet Perforation
2003-03-08 Well Log Performed
2003-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-08-07 2355.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-08-25 Open Hole/Barefoot Completion 2578.00 2919.00 0
1997-09-09 Acid Treatment 2578.00 2919.00 0
2003-03-04 Packing Device Capped w/Cement 2561.00 2569.00 0
2003-03-08 Perforation 2515.50 2518.50 17
2003-03-10 Acid Treatment 2515.50 2518.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 1284 0.0 0.0 0.0
1998 7255 0.0 0.0 0.0
1999 8326 0.0 0.0 0.0
2000 7319 0.0 0.0 0.0
2001 4069 0.0 0.0 0.0
2002 3846 0.0 0.0 0.0
2003 1224 0.0 0.0 0.0

For data sources see[6]

References