X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0315042915000

Well Details

Well ID: 0315042915000
Loading map...
Location: 00/15-29-031-04W5/0
Location Alias: 00/15-29-31-04 W5M
Location Alias 2: 00/15-29-031-04 W5/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 5
Range: 04
Section: 29
County/Municipality: Mountain View County
Well Name: EMC HARM-ELK 15-29-31-4
Operator Name: ExxonMobil Canada Ltd.
License Number: 0011717
License Date: 1956-06-26
License Status: Suspension
Spud Date: 1956-07-06
Final Drill Date: 1956-08-10
Well Total Depth: 2792.30 m
Surface Hole Latitude: 51.691325
Surface Hole Longitude: -114.530178

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-06-26 Obtained License
1956-08-10 Finished Drilling
1956-08-10 Well Mode changed to Drilled and Cased
1956-08-12 Production Casing Operation Performed
1956-08-15 Perforation Treatment Performed - Jet Perforation
1956-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-08-16 Perforation Treatment Performed - Acid Wash - No Pressure
1956-09-09 Well Began Production
1956-09-09 Well Fluid changed to Crude Oil
1956-09-09 Well Mode changed to Flowing
1957-11-21 Perforation Treatment Performed - Visqueeze
1986-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-21 Well Log Performed
1990-04-21 Perforation Treatment Performed - Jet Perforation
1990-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-11-04 Plug Back Performed
1993-11-23 Well Fluid changed to Crude Oil
1993-11-23 Well Mode changed to Abandoned and Whipstocked
1993-11-29 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-08-15 Perforation 2785.60 2791.70 13
1993-11-04 Packing Device Capped w/Cement 2732.00 2742.00 0
1956-08-16 Acid Wash 2785.60 2791.70 0
1956-08-16 Acid Treatment 2785.60 2791.70 0
1957-11-21 Visqueeze 2785.60 2791.70 0
1986-02-14 Acid Treatment 2785.60 2791.70 0
1990-04-21 Perforation 2773.10 2779.50 13
1990-04-21 Perforation 2779.50 2785.60 13
1990-04-24 Acid Treatment 2773.10 2791.70 0
1991-08-20 Acid Treatment 2773.10 2791.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4823 0.0 0.0 0.0
1968 7291 0.0 0.0 0.0
1969 7640 0.0 0.0 0.0
1970 7375 0.0 0.0 0.0
1971 7166 0.0 0.0 0.0
1972 7737 0.0 0.0 0.0
1973 7709 0.0 0.0 0.0
1974 8379 0.0 0.0 0.0
1975 8668 0.0 0.0 0.0
1976 8039 0.0 0.0 0.0
1977 8539 0.0 0.0 0.0
1978 8562 0.0 0.0 0.0
1979 8411 0.0 0.0 0.0
1980 8499 0.0 0.0 0.0
1981 8402 0.0 0.0 0.0
1982 8736 0.0 0.0 0.0
1983 7656 0.0 0.0 0.0
1984 6133 0.0 0.0 0.0
1985 7750 0.0 0.0 0.0
1986 7669 0.0 0.0 0.0
1987 8308 0.0 0.0 0.0
1988 7860 0.0 0.0 0.0
1989 7667 0.0 0.0 0.0
1990 7728 0.0 0.0 0.0
1991 8310 0.0 0.0 0.0
1992 7989 0.0 0.0 0.0
1993 7259 0.0 0.0 0.0

For data sources see[5]

References