X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0315043211000

Well Details

Well ID: 0315043211000
Loading map...
Location: 00/11-32-031-04W5/0
Location Alias: 00/11-32-31-04 W5M
Location Alias 2: 00/11-32-031-04 W5/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 5
Range: 04
Section: 32
County/Municipality: Mountain View County
Well Name: MOBIL UNIT HARM 11-32-31-4
Operator Name: ExxonMobil Canada Ltd.
License Number: 0011613
License Date: 1956-06-14
License Status: Suspension
Spud Date: 1956-06-29
Final Drill Date: 1956-08-10
Well Total Depth: 2783.10 m
Surface Hole Latitude: 51.702173
Surface Hole Longitude: -114.536226

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-06-14 Obtained License
1956-08-10 Finished Drilling
1956-08-10 Well Mode changed to Drilled and Cased
1956-08-11 Production Casing Operation Performed
1956-08-13 Perforation Treatment Performed - Open-Hole Completion
1956-08-15 Well Began Production
1956-08-15 Well Fluid changed to Crude Oil
1956-08-15 Well Mode changed to Flowing
1957-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-02-10 Well Log Performed
1988-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-05-24 Perforation Treatment Performed - Jet Perforation
1988-05-24 Well Log Performed
1988-07-06 Well Log Performed
1989-09-19 Well Fluid changed to Crude Oil
1989-09-19 Well Mode changed to Pumping
1990-05-24 Perforation Treatment Performed - Jet Perforation
1990-05-24 Well Log Performed
1990-05-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-04-13 Well Log Performed
2013-10-01 Well Fluid changed to Crude Oil
2013-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-08-13 Open Hole/Barefoot Completion 2776.70 2783.10 0
1957-05-23 Acid Treatment 2776.70 2783.10 0
1984-07-24 Acid Treatment 2776.70 2783.10 0
1988-03-12 Acid Treatment 2776.70 2783.10 0
1988-05-24 Perforation 2773.00 2775.00 13
1990-05-24 Perforation 2750.50 2754.50 13
1990-05-24 Perforation 2756.30 2768.50 13
1990-05-26 Acid Treatment 2750.50 2768.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5666 0.0 0.0 0.0
1968 8392 0.0 0.0 0.0
1969 5404 0.0 0.0 0.0
1970 6504 0.0 0.0 0.0
1971 1068 0.0 0.0 0.0
1972 5018 0.0 0.0 0.0
1973 7439 0.0 0.0 0.0
1974 8005 0.0 0.0 0.0
1975 8349 0.0 0.0 0.0
1976 6886 0.0 0.0 0.0
1977 8011 0.0 0.0 0.0
1978 7568 0.0 0.0 0.0
1979 7578 0.0 0.0 0.0
1980 8113 0.0 0.0 0.0
1981 8546 0.0 0.0 0.0
1982 8563 0.0 0.0 0.0
1983 8154 0.0 0.0 0.0
1984 7325 0.0 0.0 0.0
1985 8376 0.0 0.0 0.0
1986 8417 0.0 0.0 0.0
1987 8235 0.0 0.0 0.0
1988 6564 0.0 0.0 0.0
1989 8236 0.0 0.0 0.0
1990 8047 0.0 0.0 0.0
1991 8645 0.0 0.0 0.0
1992 6224 0.0 0.0 0.0
1993 8224 0.0 0.0 0.0
1994 8098 0.0 0.0 0.0
1995 8755 0.0 0.0 0.0
1996 8088 0.0 0.0 0.0
1997 8721 0.0 0.0 0.0
1998 8531 0.0 0.0 0.0
1999 7939 0.0 0.0 0.0
2000 8532 0.0 0.0 0.0
2001 8588 0.0 0.0 0.0
2002 6772 0.0 0.0 0.0
2003 8328 0.0 0.0 0.0
2004 7952 0.0 0.0 0.0
2005 4293 0.0 0.0 0.0
2006 8487 0.0 0.0 0.0
2007 4644 0.0 0.0 0.0
2008 2091 0.0 0.0 0.0
2009 3250 0.0 0.0 0.0
2010 7651 0.0 0.0 0.0
2011 8172 0.0 0.0 0.0
2012 2854 0.0 0.0 0.0

For data sources see[5]

References