If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0324022302020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.767244,"lon":-110.17955,"icon":""}]} |
| Location: 02/02-23-032-02W4/0 | |
| Location Alias: 02/02-23-32-02 W4M | |
| Location Alias 2: 02/02-23-032-02 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 032 | |
| Meridian: 4 | |
| Range: 02 | |
| Section: 23 | |
| County/Municipality: Special Areas No. 4 | |
| Well Name: PENN WEST 102 HZ ESTHER 2-23-32-2 | |
| Operator Name: Obsidian Energy Ltd. | |
| License Number: 0484294 | |
| License Date: 2017-06-29 | |
| License Status: Issued | |
| Spud Date: 2017-07-13 | |
| Final Drill Date: 2017-07-16 | |
| Well Total Depth: 2387.00 m | |
| Surface Hole Latitude: 51.767244 | |
| Surface Hole Longitude: -110.179550 |
| Date | Event |
|---|---|
| 2017-06-29 | Obtained License |
| 2017-07-13 | Surface Casing Operation Performed |
| 2017-07-14 | Direction Drilling Operation Performed - Deviate |
| 2017-07-14 | Direction Drilling Operation Performed - Horizontal |
| 2017-07-15 | Well Log Performed |
| 2017-07-16 | Finished Drilling |
| 2017-07-16 | Production Casing Operation Performed |
| 2017-07-16 | Well Mode changed to Drilled and Cased |
| 2017-07-17 | Rig Released |
| 2017-08-20 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-08-21 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-08-23 | Well Began Production |
| 2017-08-23 | Well Fluid changed to Crude Oil |
| 2017-08-23 | Well Mode changed to Flowing |
| 2017-10-20 | Well Fluid changed to Crude Oil |
| 2017-10-20 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2017-07-13 | Precision Drilling Corporation | 152 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2017-07-14 | 348.00 | Deviate (5 - 79 degrees) |
| 2017-07-14 | 828.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2017-08-20 | Multi-Stage Fracture | 2371.00 | 2371.80 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 1905.50 | 1906.30 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 1851.80 | 1852.60 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 1797.90 | 1798.80 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 1745.20 | 1746.10 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 1690.80 | 1691.70 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 1638.10 | 1638.90 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 1583.80 | 1584.60 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 1532.00 | 1532.90 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 1477.80 | 1478.70 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 1424.70 | 1425.60 | 0 |
| 2017-08-20 | Multi-Stage Fracture | 2329.70 | 2330.50 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 1370.40 | 1371.30 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 1316.20 | 1317.10 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 1262.20 | 1263.00 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 1207.30 | 1208.20 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 1152.90 | 1153.70 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 1098.60 | 1099.40 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 1044.90 | 1045.70 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 990.40 | 991.20 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 935.50 | 936.40 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 880.90 | 881.70 | 0 |
| 2017-08-20 | Multi-Stage Fracture | 2288.40 | 2289.20 | 0 |
| 2017-08-20 | Multi-Stage Fracture | 2233.50 | 2234.40 | 0 |
| 2017-08-20 | Multi-Stage Fracture | 2178.70 | 2179.60 | 0 |
| 2017-08-20 | Multi-Stage Fracture | 2124.20 | 2125.10 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 2069.60 | 2070.50 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 2014.90 | 2015.70 | 0 |
| 2017-08-21 | Multi-Stage Fracture | 1960.30 | 1961.10 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2017-08-20 | 2017-08-21 | 723 | 1,060 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | water | 7732-18-5 | 100 | 63.3854 | N/A | |||
| Frac Sand - Regular | Iron Horse Energy Services | Crystalline Silica | 14808-60-7 | 100 | 25.994 | N/A | ||
| Tolcide PS75LT | Fusion Technologies Inc. | Bactericide/Biocide | Tetrakis(Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0403 | N/A | |
| water | 7732-18-5 | 100 | 0.0403 | N/A | ||||
| IH-BEZ-6D | Fusion Technologies Inc. | Breaker | Ethylene glycol | 107-21-1 | 100 | 0.0444 | N/A | |
| Nitrogen | Iron Horse Energy Services | Energizing Fluid | nitrogen | 7727-37-9 | 100 | 10.9636 | N/A | |
| IH-FM-2 | Fusion Technologies Inc. | Foamer | 2-butoxyethanol | 111-76-2 | 100 | 0.1979 | N/A | |
| EO-Dodecyl Alcohol | 32612-48-9 | 100 | 0.1979 | N/A | ||||
| Ethanol | 64-17-5 | 100 | 0.1979 | N/A | ||||
| Isopropanol | 67-63-0 | 100 | 0.1979 | N/A | ||||
| Sodium C14 to C16 Olefin | 68439-57-6 | 100 | 0.1979 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.1979 | N/A | ||||
| IH-GA-1 | Fusion Technologies Inc. | Gelling Agent | Low toxicity mineral oil | 8042-47-5 | 100 | 0.2197 | N/A | |
| IH-NE-7 | Fusion Technologies Inc. | Surfactant | Methanol | 67-56-1 | 100 | 0.0507 | N/A | |
| Trimethylopropane ethoxylated | 52624-57-4 | 100 | 0.0507 | N/A | ||||
| water | 7732-18-5 | 100 | 0.0507 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2017-08-10 | 2017-08-11 | Surface Water - Runoff | 900 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 2510 | 0.0 | 0.0 | 0.0 |
| 2018 | 8526 | 0.0 | 0.0 | 0.0 |
| 2019 | 8293 | 0.0 | 0.0 | 0.0 |
| 2020 | 2165 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-07-17 | No Incident Encountered | 0.00 | 0.00 |
| 2017-08-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]