If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0324102004000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.753793,"lon":-111.393632,"icon":""}]} |
| Location: 00/04-20-032-10W4/0 | |
| Location Alias: 00/04-20-32-10 W4M | |
| Location Alias 2: 00/04-20-032-10 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 032 | |
| Meridian: 4 | |
| Range: 10 | |
| Section: 20 | |
| County/Municipality: Special Areas No. 2 | |
| Well Name: GEODYNE PROD PROVO 4-20-32-10 | |
| Operator Name: Tudor Corporation Ltd. | |
| License Number: 0294689 | |
| License Date: 2003-10-20 | |
| License Status: Suspension | |
| Spud Date: 2004-08-17 | |
| Final Drill Date: 2004-08-19 | |
| Well Total Depth: 1092.00 m | |
| Surface Hole Latitude: 51.753793 | |
| Surface Hole Longitude: -111.393632 |
| Date | Event |
|---|---|
| 2003-10-20 | Obtained License |
| 2004-08-17 | Surface Casing Operation Performed |
| 2004-08-19 | Finished Drilling |
| 2004-08-19 | Well Mode changed to Drilled and Cased |
| 2004-08-20 | Production Casing Operation Performed |
| 2004-08-20 | Rig Released |
| 2004-08-20 | Well Log Performed |
| 2004-09-14 | Perforation Treatment Performed - Jet Perforation |
| 2004-10-06 | Well Began Production |
| 2004-10-06 | Well Fluid changed to Crude Oil |
| 2004-10-06 | Well Mode changed to Pumping |
| 2005-01-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2005-01-19 | Perforation Treatment Performed - Jet Perforation |
| 2005-01-19 | Plug Back Performed |
| 2005-01-19 | Well Fluid changed to Crude Oil |
| 2005-01-19 | Well Mode changed to Abandoned Zone |
| 2005-04-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2005-04-21 | Perforation Treatment Performed - Jet Perforation |
| 2005-04-21 | Plug Back Performed |
| 2016-11-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2016-11-03 | Plug Back Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2004-09-14 | Perforation | 1039.70 | 1041.50 | 13 |
| 2005-01-19 | Packing Device Capped w/Cement | 1028.00 | 1035.00 | 0 |
| 2005-01-19 | Perforation | 948.50 | 952.50 | 13 |
| 2005-04-21 | Packing Device Capped w/Cement | 938.00 | 946.00 | 0 |
| 2005-04-21 | Perforation | 895.00 | 896.00 | 17 |
| 2016-11-03 | Packing Device Capped w/Cement | 883.00 | 891.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2004 | 1829 | 0.0 | 0.0 | 0.0 |
| 2005 | 87 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2016-11-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]