X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324113306000

Well Details

Well ID: 0324113306000
Loading map...
Location: 00/06-33-032-11W4/0
Location Alias: 00/06-33-32-11 W4M
Location Alias 2: 00/06-33-032-11 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 11
Section: 33
County/Municipality: Special Areas No. 2
Well Name: SUNDANCE ET AL KIRKPAT 6-33-32-11
Operator Name: Sundance Oil Canada Ltd
License Number: 0055483
License Date: 1975-10-22
License Status: Re-Entered
Spud Date: 1975-10-24
Final Drill Date: 1975-10-29
Well Total Depth: 1097.30 m
Surface Hole Latitude: 51.784500
Surface Hole Longitude: -111.510519

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-10-22 Obtained License
1975-10-25 Lost Circulation Occurred
1975-10-29 Finished Drilling
1975-10-29 Well Mode changed to Drilled and Cased
1975-10-30 Drill Stem Test Performed
1975-10-31 Drill Stem Test Performed
1975-10-31 Production Casing Operation Performed
1975-11-06 Perforation Treatment Performed - Jet Perforation
1975-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-11-10 Perforation Treatment Performed - Fractured
1975-11-27 Perforation Treatment Performed - Jet Perforation
1976-04-22 Well Began Production
1976-04-22 Well Fluid changed to Gas
1976-04-22 Well Mode changed to Flowing
1976-09-01 Well Fluid changed to Gas
1976-09-01 Well Mode changed to Suspended
1978-05-06 Perforation Treatment Performed - Cement Squeeze
1978-05-09 Perforation Treatment Performed - Jet Perforation
1978-05-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-05-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-01-31 Perforation Treatment Performed - Jet Perforation
1981-06-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-06-20 Well Abandoned
1981-06-20 Well Fluid changed to Gas
1981-06-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-11-06 Perforation 916.50 918.70 13
1981-01-31 Perforation 925.30 927.50 13
1981-06-20 Packing Device Capped w/Cement 910.50 918.50 0
1975-11-10 Acid Treatment 916.50 918.70 0
1975-11-10 Fracture 916.50 918.70 0
1975-11-27 Perforation 1069.20 1071.10 13
1978-05-06 Cement Squeeze 916.50 918.70 0
1978-05-09 Perforation 1069.20 1071.10 13
1978-05-10 Acid Treatment 1069.20 1071.10 0
1978-05-29 Acid Treatment 1069.20 1071.10 0
1981-01-29 Packing Device Capped w/Cement 1055.00 1055.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 1392 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1975-10-25 Lost Circulation 40.00 40.00

For data sources see[6]

References